BAM NUTTALL LTD (full details)

Spent by updatedCheshire West and Chester with BAM NUTTALL LIMITED

Total spend £6,057,772
Average monthly spend £1,009,628
Spend By Month Chart

Information about this supplier

Full Name
BAM NUTTALL LIMITED
Supplier Ref
4228
Company Number
00305189

Other organisations making payments to BAM NUTTALL LIMITED

Money paid to this supplier by updatedCheshire West and Chester
DateDepartmentCategoryValue
April 16 2010 Central Balances Construction £4,829.83
April 20 2010 Community & Environment Hired + Contracted Svces £4,164.15
April 21 2010 Community & Environment Repairs + Mtce of Bldgs £11,562.98
April 23 2010 Community & Environment Vehicle Repairs + Maint £2,228.89
April 23 2010 Community & Environment Vehicle Repairs + Maint £1,925.17
April 23 2010 Community & Environment Vehicle Repairs + Maint £507.57
April 30 2010 Regeneration & Culture Repairs + Mtce of Grounds £4,986.89
May 1 2010 Community & Environment Fuel £1,716.77
May 1 2010 Community & Environment Fuel £524.37
May 5 2010 Community & Environment Hired + Contracted Svces £4,584.03
May 7 2010 Community & Environment Hired + Contracted Svces £5,151.44
May 21 2010 Community & Environment Road Maintenance £3,681.81
May 21 2010 Community & Environment Road Maintenance £3,520.96
May 21 2010 Community & Environment Road Maintenance £3,479.26
May 21 2010 Community & Environment Rech for Overheads £3,465.23
May 21 2010 Community & Environment Road Maintenance £3,388.00
May 21 2010 Community & Environment Road Maintenance £3,372.97
May 21 2010 Central Balances Projs Non Lab Clearing Ac £3,257.58
May 21 2010 Community & Environment Road Maintenance £3,196.03
May 21 2010 Central Balances Projs Non Lab Clearing Ac £3,189.32
May 21 2010 Community & Environment Road Maintenance £3,160.44
May 21 2010 Community & Environment Road Maintenance £3,119.78
May 21 2010 Community & Environment Road Maintenance £3,098.64
May 21 2010 Community & Environment Road Maintenance £3,009.79
May 21 2010 Community & Environment Road Maintenance £3,006.93
May 21 2010 Community & Environment Road Maintenance £3,004.83
May 21 2010 Community & Environment Road Maintenance £2,904.65
May 21 2010 Community & Environment Road Maintenance £2,901.04
May 21 2010 Community & Environment Road Maintenance £2,880.01
May 21 2010 Community & Environment Road Maintenance £2,878.15
May 21 2010 Community & Environment Road Maintenance £2,873.64
May 21 2010 Community & Environment Road Maintenance £2,861.69
May 21 2010 Community & Environment Road Maintenance £2,779.76
May 21 2010 Community & Environment Road Maintenance £2,750.46
May 21 2010 Community & Environment Road Maintenance £2,744.97
May 21 2010 Community & Environment Road Maintenance £2,733.84
May 21 2010 Community & Environment Road Maintenance £2,717.13
May 21 2010 Community & Environment Road Maintenance £2,715.79
May 21 2010 Central Balances Construction £2,714.43
May 21 2010 Community & Environment Road Maintenance £2,600.18
May 21 2010 Community & Environment Road Maintenance £2,582.65
May 21 2010 Central Balances Construction £2,565.38
May 21 2010 Community & Environment Road Maintenance £2,455.71
May 21 2010 Community & Environment Road Maintenance £2,421.61
May 21 2010 Central Balances Construction £2,291.91
May 21 2010 Community & Environment Road Maintenance £2,267.81
May 21 2010 Community & Environment Road Maintenance £2,262.57
May 21 2010 Central Balances Construction £2,236.14
May 21 2010 Central Balances Construction £2,149.96
May 21 2010 Community & Environment Road Maintenance £2,129.36
May 21 2010 Community & Environment Road Maintenance £2,122.41
May 21 2010 Community & Environment Road Maintenance £2,087.61
May 21 2010 Community & Environment Road Maintenance £2,061.29
May 21 2010 Central Balances Construction £2,020.75
May 21 2010 Central Balances Projs Non Lab Clearing Ac £2,013.76
May 21 2010 Community & Environment Road Maintenance £1,978.08
May 21 2010 Community & Environment Rech for Overheads £1,958.10
May 21 2010 Community & Environment Road Maintenance £1,948.05
May 21 2010 Community & Environment Road Maintenance £1,937.09
May 21 2010 Community & Environment Road Maintenance £1,932.66
May 21 2010 Community & Environment Road Maintenance £1,916.34
May 21 2010 Community & Environment Road Maintenance £1,909.08
May 21 2010 Community & Environment Rech for Overheads £1,815.22
May 21 2010 Community & Environment Road Maintenance £1,698.54
May 21 2010 Community & Environment Road Maintenance £1,593.30
May 21 2010 Community & Environment Road Maintenance £1,575.23
May 21 2010 Community & Environment Road Maintenance £1,564.13
May 21 2010 Central Balances Projs Non Lab Clearing Ac £1,541.47
May 21 2010 Community & Environment Road Maintenance £1,500.05
May 21 2010 Community & Environment Winter Maintenance £1,479.35
May 21 2010 Central Balances Projs Non Lab Clearing Ac £1,458.85
May 21 2010 Central Balances Projs Non Lab Clearing Ac £1,419.33
May 21 2010 Community & Environment Winter Maintenance £1,405.16
May 21 2010 Central Balances Construction £1,382.00
May 21 2010 Community & Environment Road Maintenance £1,200.30
May 21 2010 Community & Environment Road Maintenance £1,197.10
May 21 2010 Community & Environment Road Maintenance £1,192.11
May 21 2010 Central Balances Construction £1,144.78
May 21 2010 Community & Environment Road Maintenance £1,133.91
May 21 2010 Community & Environment Road Maintenance £1,133.91
May 21 2010 Community & Environment Road Maintenance £1,133.58
May 21 2010 Central Balances Construction £1,005.93
May 21 2010 Community & Environment Road Maintenance £933.78
May 21 2010 Central Balances Projs Non Lab Clearing Ac £871.66
May 21 2010 Community & Environment Road Maintenance £856.96
May 21 2010 Community & Environment Road Maintenance £848.56
May 21 2010 Community & Environment Road Maintenance £808.60
May 21 2010 Community & Environment Road Maintenance £794.25
May 21 2010 Community & Environment Road Maintenance £794.15
May 21 2010 Community & Environment Road Maintenance £792.89
May 21 2010 Community & Environment Road Maintenance £773.81
May 21 2010 Community & Environment Road Maintenance £767.00
May 21 2010 Community & Environment Rech for Overheads £761.17
May 21 2010 Central Balances Construction £759.66
May 21 2010 Community & Environment Road Maintenance £752.23
May 21 2010 Central Balances Projs Non Lab Clearing Ac £736.84
May 21 2010 Central Balances Projs Non Lab Clearing Ac £736.84
May 21 2010 Community & Environment Road Maintenance £736.76
May 21 2010 Community & Environment Road Maintenance £736.76
May 21 2010 Community & Environment Road Maintenance £736.76
May 21 2010 Community & Environment Road Maintenance £734.68
May 21 2010 Central Balances Projs Non Lab Clearing Ac £714.26
May 21 2010 Central Balances Projs Non Lab Clearing Ac £691.69
May 21 2010 Community & Environment Road Maintenance £684.58
May 21 2010 Central Balances Projs Non Lab Clearing Ac £675.84
May 21 2010 Central Balances Projs Non Lab Clearing Ac £675.84
May 21 2010 Central Balances Projs Non Lab Clearing Ac £669.12
May 21 2010 Central Balances Projs Non Lab Clearing Ac £669.12
May 21 2010 Community & Environment Road Maintenance £661.25
May 21 2010 Community & Environment Road Maintenance £645.58
May 21 2010 Community & Environment Road Maintenance £644.25
May 21 2010 Community & Environment Road Maintenance £639.25
May 21 2010 Community & Environment Road Maintenance £637.67
May 21 2010 Central Balances Construction £626.38
May 21 2010 Community & Environment Rech for Overheads £615.16
May 21 2010 Community & Environment Road Maintenance £594.65
May 21 2010 Community & Environment Road Maintenance £594.65
May 21 2010 Community & Environment Road Maintenance £594.65
May 21 2010 Community & Environment Road Maintenance £594.65
May 21 2010 Central Balances Construction £587.38
May 21 2010 Community & Environment Road Maintenance £585.17
May 21 2010 Community & Environment Road Maintenance £580.30
May 21 2010 Community & Environment Rech for Overheads £552.57
May 21 2010 Community & Environment Road Maintenance £545.78
May 21 2010 Community & Environment Road Maintenance £538.28
May 21 2010 Central Balances Projs Non Lab Clearing Ac £537.00
May 21 2010 Central Balances Projs Non Lab Clearing Ac £514.24
May 21 2010 Community & Environment Road Maintenance £503.94
May 21 2010 Central Balances Projs Non Lab Clearing Ac £32,878.33
May 21 2010 Community & Environment Road Maintenance £4,027.50
May 21 2010 Community & Environment Road Maintenance £4,018.66
May 21 2010 Community & Environment Road Maintenance £3,997.59
May 21 2010 Community & Environment Road Maintenance £3,970.05
May 21 2010 Central Balances Projs Non Lab Clearing Ac £3,832.88
May 21 2010 Community & Environment Road Maintenance £3,821.10
May 21 2010 Community & Environment Road Maintenance £3,753.81
May 21 2010 Community & Environment Road Maintenance £3,727.08
May 21 2010 Community & Environment Road Maintenance £3,720.67
May 21 2010 Community & Environment Road Maintenance £3,714.66
May 21 2010 Community & Environment Road Maintenance £5,483.03
May 21 2010 Community & Environment Road Maintenance £5,285.28
May 21 2010 Community & Environment Road Maintenance £5,256.54
May 21 2010 Community & Environment Road Maintenance £4,712.53
May 21 2010 Community & Environment Road Maintenance £4,651.92
May 21 2010 Community & Environment Road Maintenance £4,615.70
May 21 2010 Community & Environment Road Maintenance £4,317.60
May 21 2010 Community & Environment Road Maintenance £4,244.03
May 21 2010 Community & Environment Road Maintenance £4,148.30
May 21 2010 Community & Environment Road Maintenance £99,997.00
May 21 2010 Community & Environment Road Maintenance £62,879.97
May 21 2010 Community & Environment Road Maintenance £61,762.72
May 21 2010 Central Balances Projs Non Lab Clearing Ac £59,015.06
May 21 2010 Community & Environment Road Maintenance £4,044.45
May 21 2010 Community & Environment Road Maintenance £31,516.30
May 21 2010 Central Balances Projs Non Lab Clearing Ac £30,092.14
May 21 2010 Community & Environment Road Maintenance £26,395.23
May 21 2010 Community & Environment Road Maintenance £24,838.66
May 21 2010 Community & Environment Road Maintenance £23,675.69
May 21 2010 Community & Environment Road Maintenance £19,968.79
May 21 2010 Central Balances Projs Non Lab Clearing Ac £18,848.34
May 21 2010 Community & Environment Road Maintenance £17,946.78
May 21 2010 Central Balances Projs Non Lab Clearing Ac £17,380.05
May 21 2010 Central Balances Projs Non Lab Clearing Ac £16,259.98
May 21 2010 Community & Environment Road Maintenance £14,563.99
May 21 2010 Community & Environment Road Maintenance £14,148.93
May 21 2010 Central Balances Projs Non Lab Clearing Ac £13,751.30
May 21 2010 Central Balances Projs Non Lab Clearing Ac £12,618.06
May 21 2010 Community & Environment Road Maintenance £12,363.66
May 21 2010 Community & Environment Road Maintenance £11,983.58
May 21 2010 Community & Environment Road Maintenance £11,640.58
May 21 2010 Community & Environment Rech for Overheads £11,357.79
May 21 2010 Community & Environment Road Maintenance £10,700.11
May 21 2010 Central Balances Projs Non Lab Clearing Ac £10,484.50
May 21 2010 Community & Environment Road Maintenance £10,443.07
May 21 2010 Community & Environment Road Maintenance £8,583.71
May 21 2010 Community & Environment Road Maintenance £8,483.59
May 21 2010 Central Balances Construction £8,329.61
May 21 2010 Community & Environment Road Maintenance £7,300.58
May 21 2010 Community & Environment Road Maintenance £7,091.73
May 21 2010 Community & Environment Road Maintenance £6,742.79
May 21 2010 Community & Environment Road Maintenance £6,270.15
May 21 2010 Central Balances Projs Non Lab Clearing Ac £6,150.62
May 21 2010 Community & Environment Road Maintenance £5,839.00
May 21 2010 Community & Environment Road Maintenance £5,754.08
May 21 2010 Central Balances Projs Non Lab Clearing Ac £5,557.63
May 21 2010 Community & Environment Road Maintenance £5,486.51
May 24 2010 Community & Environment Road Maintenance £7,778.09
May 24 2010 Community & Environment Road Maintenance £54,050.00
June 1 2010 Community & Environment Fuel £2,285.18
June 1 2010 Community & Environment Fuel £556.67
June 3 2010 Community & Environment Vehicle Repairs + Maint £617.40
June 24 2010 Community & Environment Vehicle Repairs + Maint £1,636.00
June 24 2010 Community & Environment Vehicle Repairs + Maint £2,341.98
June 24 2010 Community & Environment Vehicle Repairs + Maint £887.28
June 25 2010 Community & Environment Vehicle Repairs + Maint £920.20
June 28 2010 Central Balances Construction £809.51
June 28 2010 Community & Environment Rech for Overheads £792.82
June 28 2010 Community & Environment Rech for Overheads £791.92
June 28 2010 Community & Environment Road Maintenance £782.54
June 28 2010 Community & Environment Road Maintenance £767.46
June 28 2010 Central Balances Construction £735.22
June 28 2010 Central Balances Construction £735.22
June 28 2010 Central Balances Projs Non Lab Clearing Ac £733.01
June 28 2010 Community & Environment Road Maintenance £710.23
June 28 2010 Community & Environment Road Maintenance £710.23
June 28 2010 Community & Environment Road Maintenance £705.64
June 28 2010 Central Balances Construction £702.49
June 28 2010 Community & Environment Road Maintenance £688.09
June 28 2010 Central Balances Construction £661.14
June 28 2010 Central Balances Construction £661.14
June 28 2010 Central Balances Construction £661.14
June 28 2010 Central Balances Construction £661.14
June 28 2010 Central Balances Construction £661.14
June 28 2010 Community & Environment Road Maintenance £649.89
June 28 2010 Community & Environment Road Maintenance £644.29
June 28 2010 Community & Environment Road Maintenance £640.55
June 28 2010 Community & Environment Rech for Overheads £625.30
June 28 2010 Community & Environment Road Maintenance £617.53
June 28 2010 Central Balances Construction £614.60
June 28 2010 Community & Environment Road Maintenance £610.48
June 28 2010 Community & Environment Road Maintenance £607.82
June 28 2010 Central Balances Construction £607.82
June 28 2010 Community & Environment Road Maintenance £605.01
June 28 2010 Community & Environment Road Maintenance £603.59
June 28 2010 Community & Environment Road Maintenance £598.50
June 28 2010 Community & Environment Road Maintenance £598.46
June 28 2010 Community & Environment Road Maintenance £595.62
June 28 2010 Community & Environment Rech for Overheads £590.77
June 28 2010 Community & Environment Rech for Overheads £587.72
June 28 2010 Central Balances Construction £584.16
June 28 2010 Community & Environment Road Maintenance £583.84
June 28 2010 Community & Environment Road Maintenance £575.28
June 28 2010 Community & Environment Road Maintenance £574.88
June 28 2010 Community & Environment Road Maintenance £546.90
June 28 2010 Community & Environment Road Maintenance £539.12
June 28 2010 Community & Environment Road Maintenance £533.97
June 28 2010 Community & Environment Road Maintenance £532.12
June 28 2010 Community & Environment Road Maintenance £531.53
June 28 2010 Community & Environment Road Maintenance £531.53
June 28 2010 Community & Environment Road Maintenance £531.53
June 28 2010 Community & Environment Road Maintenance £531.53
June 28 2010 Community & Environment Road Maintenance £531.53
June 28 2010 Community & Environment Road Maintenance £521.52
June 28 2010 Community & Environment Road Maintenance £514.54
June 28 2010 Community & Environment Road Maintenance £505.58
June 28 2010 Community & Environment Road Maintenance £792.72
June 28 2010 Central Balances Projs Non Lab Clearing Ac £48,012.21
June 28 2010 Central Balances Projs Non Lab Clearing Ac £38,384.80
June 28 2010 Central Balances Projs Non Lab Clearing Ac £32,686.81
June 28 2010 Community & Environment Road Maintenance £31,449.69
June 28 2010 Central Balances Projs Non Lab Clearing Ac £27,954.88
June 28 2010 Community & Environment Road Maintenance £26,339.46
June 28 2010 Central Balances Projs Non Lab Clearing Ac £26,239.13
June 28 2010 Community & Environment Road Maintenance £24,786.16
June 28 2010 Community & Environment Road Maintenance £23,625.67
June 28 2010 Community & Environment Rech for Overheads £23,360.95
June 28 2010 Central Balances Projs Non Lab Clearing Ac £22,699.45
June 28 2010 Community & Environment Road Maintenance £22,536.80
June 28 2010 Central Balances Projs Non Lab Clearing Ac £21,156.03
June 28 2010 Community & Environment Road Maintenance £19,926.59
June 28 2010 Community & Environment Road Maintenance £19,803.60
June 28 2010 Central Balances Projs Non Lab Clearing Ac £18,184.68
June 28 2010 Community & Environment Rech for Overheads £16,562.38
June 28 2010 Central Balances Projs Non Lab Clearing Ac £16,432.99
June 28 2010 Central Balances Projs Non Lab Clearing Ac £16,024.56
June 28 2010 Community & Environment Road Maintenance £15,177.01
June 28 2010 Community & Environment Road Maintenance £14,940.69
June 28 2010 Community & Environment Road Maintenance £14,226.51
June 28 2010 Central Balances Projs Non Lab Clearing Ac £13,590.06
June 28 2010 Community & Environment Road Maintenance £13,288.21
June 28 2010 Central Balances Projs Non Lab Clearing Ac £12,025.84
June 28 2010 Central Balances Projs Non Lab Clearing Ac £11,759.78
June 28 2010 Central Balances Projs Non Lab Clearing Ac £11,757.00
June 28 2010 Community & Environment Road Maintenance £11,282.57
June 28 2010 Central Balances Projs Non Lab Clearing Ac £10,457.23
June 28 2010 Community & Environment Road Maintenance £10,420.52
June 28 2010 Central Balances Projs Non Lab Clearing Ac £10,067.90
June 28 2010 Central Balances Projs Non Lab Clearing Ac £9,949.62
June 28 2010 Central Balances Projs Non Lab Clearing Ac £8,986.39
June 28 2010 Community & Environment Road Maintenance £8,565.40
June 28 2010 Central Balances Projs Non Lab Clearing Ac £8,402.65
June 28 2010 Community & Environment Road Maintenance £8,370.83
June 28 2010 Community & Environment Road Maintenance £7,963.02
June 28 2010 Community & Environment Road Maintenance £7,647.85
June 28 2010 Community & Environment Road Maintenance £7,424.64
June 28 2010 Central Balances Projs Non Lab Clearing Ac £7,401.68
June 28 2010 Community & Environment Road Maintenance £7,133.83
June 28 2010 Central Balances Construction £7,114.99
June 28 2010 Community & Environment Road Maintenance £7,028.86
June 28 2010 Community & Environment Road Maintenance £6,256.05
June 28 2010 Central Balances Projs Non Lab Clearing Ac £6,100.21
June 28 2010 Community & Environment Road Maintenance £5,917.46
June 28 2010 Community & Environment Road Maintenance £5,895.67
June 28 2010 Central Balances Projs Non Lab Clearing Ac £5,877.80
June 28 2010 Community & Environment Road Maintenance £5,824.08
June 28 2010 Community & Environment Road Maintenance £5,816.86
June 28 2010 Community & Environment Road Maintenance £5,680.74
June 28 2010 Community & Environment Road Maintenance £5,549.37
June 28 2010 Community & Environment Road Maintenance £5,526.64
June 28 2010 Community & Environment Road Maintenance £5,484.87
June 28 2010 Community & Environment Road Maintenance £5,406.45
June 28 2010 Community & Environment Road Maintenance £5,404.29
June 28 2010 Community & Environment Road Maintenance £5,391.02
June 28 2010 Central Balances Construction £5,383.73
June 28 2010 Community & Environment Road Maintenance £5,381.72
June 28 2010 Central Balances Construction £5,278.48
June 28 2010 Central Balances Construction £5,137.52
June 28 2010 Central Balances Projs Non Lab Clearing Ac £5,089.43
June 28 2010 Community & Environment Road Maintenance £4,996.19
June 28 2010 Community & Environment Road Maintenance £4,925.22
June 28 2010 Community & Environment Road Maintenance £4,912.80
June 28 2010 Community & Environment Road Maintenance £4,882.06
June 28 2010 Community & Environment Road Maintenance £4,838.00
June 28 2010 Community & Environment Road Maintenance £4,793.90
June 28 2010 Community & Environment Road Maintenance £4,784.88
June 28 2010 Community & Environment Road Maintenance £4,705.42
June 28 2010 Community & Environment Road Maintenance £4,605.96
June 28 2010 Community & Environment Road Maintenance £4,599.96
June 28 2010 Community & Environment Rech for Overheads £4,561.35
June 28 2010 Community & Environment Road Maintenance £4,538.26
June 28 2010 Community & Environment Road Maintenance £4,437.33
June 28 2010 Community & Environment Road Maintenance £4,407.69
June 28 2010 Community & Environment Road Maintenance £4,404.51
June 28 2010 Community & Environment Road Maintenance £4,332.15
June 28 2010 Community & Environment Road Maintenance £4,250.55
June 28 2010 Central Balances Projs Non Lab Clearing Ac £4,233.28
June 28 2010 Community & Environment Rech for Overheads £4,116.11
June 28 2010 Community & Environment Road Maintenance £4,101.27
June 28 2010 Community & Environment Road Maintenance £3,980.35
June 28 2010 Community & Environment Road Maintenance £3,952.62
June 28 2010 Central Balances Construction £3,864.42
June 28 2010 Central Balances Projs Non Lab Clearing Ac £3,811.87
June 28 2010 Community & Environment Road Maintenance £3,788.84
June 28 2010 Community & Environment Road Maintenance £3,785.92
June 28 2010 Central Balances Projs Non Lab Clearing Ac £3,769.64
June 28 2010 Community & Environment Road Maintenance £3,707.77
June 28 2010 Community & Environment Road Maintenance £3,705.74
June 28 2010 Community & Environment Road Maintenance £3,648.17
June 28 2010 Community & Environment Rech for Overheads £3,639.68
June 28 2010 Community & Environment Road Maintenance £3,597.96
June 28 2010 Community & Environment Road Maintenance £3,550.73
June 28 2010 Community & Environment Road Maintenance £3,505.94
June 28 2010 Community & Environment Road Maintenance £3,478.70
June 28 2010 Community & Environment Road Maintenance £3,394.53
June 28 2010 Community & Environment Road Maintenance £3,372.70
June 28 2010 Community & Environment Road Maintenance £3,300.54
June 28 2010 Community & Environment Road Maintenance £3,289.04
June 28 2010 Central Balances Construction £3,265.18
June 28 2010 Community & Environment Road Maintenance £3,254.61
June 28 2010 Central Balances Construction £3,220.94
June 28 2010 Community & Environment Road Maintenance £3,197.69
June 28 2010 Community & Environment Road Maintenance £3,195.86
June 28 2010 Community & Environment Road Maintenance £3,172.72
June 28 2010 Central Balances Projs Non Lab Clearing Ac £3,162.17
June 28 2010 Community & Environment Road Maintenance £3,098.20
June 28 2010 Community & Environment Road Maintenance £3,087.59
June 28 2010 Central Balances Construction £3,085.06
June 28 2010 Community & Environment Road Maintenance £3,081.19
June 28 2010 Community & Environment Road Maintenance £3,050.98
June 28 2010 Community & Environment Road Maintenance £3,005.94
June 28 2010 Community & Environment Road Maintenance £2,993.35
June 28 2010 Community & Environment Road Maintenance £2,901.29
June 28 2010 Community & Environment Road Maintenance £2,827.86
June 28 2010 Community & Environment Road Maintenance £2,818.46
June 28 2010 Community & Environment Road Maintenance £2,812.48
June 28 2010 Community & Environment Road Maintenance £2,805.28
June 28 2010 Community & Environment Road Maintenance £2,799.53
June 28 2010 Community & Environment Road Maintenance £2,798.32
June 28 2010 Community & Environment Road Maintenance £2,778.85
June 28 2010 Community & Environment Road Maintenance £2,776.45
June 28 2010 Community & Environment Road Maintenance £2,773.67
June 28 2010 Community & Environment Road Maintenance £2,761.18
June 28 2010 Community & Environment Road Maintenance £2,743.99
June 28 2010 Community & Environment Road Maintenance £2,693.57
June 28 2010 Community & Environment Road Maintenance £2,685.01
June 28 2010 Community & Environment Road Maintenance £2,667.34
June 28 2010 Community & Environment Road Maintenance £2,663.07
June 28 2010 Community & Environment Road Maintenance £2,566.62
June 28 2010 Community & Environment Road Maintenance £2,498.03
June 28 2010 Community & Environment Road Maintenance £2,494.05
June 28 2010 Central Balances Projs Non Lab Clearing Ac £2,491.82
June 28 2010 Community & Environment Road Maintenance £2,470.72
June 28 2010 Central Balances Projs Non Lab Clearing Ac £2,462.88
June 28 2010 Community & Environment Road Maintenance £2,419.00
June 28 2010 Central Balances Projs Non Lab Clearing Ac £2,418.09
June 28 2010 Community & Environment Road Maintenance £2,390.28
June 28 2010 Community & Environment Road Maintenance £2,354.38
June 28 2010 Community & Environment Road Maintenance £2,311.82
June 28 2010 Central Balances Projs Non Lab Clearing Ac £2,299.14
June 28 2010 Community & Environment Road Maintenance £2,267.81
June 28 2010 Community & Environment Road Maintenance £2,248.66
June 28 2010 Community & Environment Road Maintenance £2,235.88
June 28 2010 Community & Environment Road Maintenance £2,234.82
June 28 2010 Community & Environment Road Maintenance £2,223.66
June 28 2010 Central Balances Construction £2,175.09
June 28 2010 Community & Environment Road Maintenance £2,156.41
June 28 2010 Community & Environment Road Maintenance £2,144.83
June 28 2010 Community & Environment Road Maintenance £2,113.76
June 28 2010 Community & Environment Road Maintenance £2,081.16
June 28 2010 Community & Environment Road Maintenance £2,039.05
June 28 2010 Community & Environment Road Maintenance £1,983.76
June 28 2010 Community & Environment Road Maintenance £1,917.58
June 28 2010 Central Balances Projs Non Lab Clearing Ac £1,888.78
June 28 2010 Community & Environment Road Maintenance £1,887.12
June 28 2010 Community & Environment Road Maintenance £1,877.05
June 28 2010 Central Balances Construction £1,852.52
June 28 2010 Community & Environment Road Maintenance £1,828.73
June 28 2010 Central Balances Construction £1,818.86
June 28 2010 Community & Environment Rech for Overheads £1,615.70
June 28 2010 Community & Environment Road Maintenance £1,560.79
June 28 2010 Central Balances Projs Non Lab Clearing Ac £1,523.14
June 28 2010 Community & Environment Road Maintenance £1,510.82
June 28 2010 Community & Environment Road Maintenance £1,449.82
June 28 2010 Community & Environment Winter Maintenance £1,405.16
June 28 2010 Central Balances Construction £1,388.91
June 28 2010 Central Balances Projs Non Lab Clearing Ac £1,375.14
June 28 2010 Community & Environment Rech for Overheads £1,354.97
June 28 2010 Community & Environment Road Maintenance £1,349.32
June 28 2010 Community & Environment Road Maintenance £1,338.90
June 28 2010 Community & Environment Road Maintenance £1,336.04
June 28 2010 Central Balances Construction £1,302.92
June 28 2010 Central Balances Projs Non Lab Clearing Ac £1,289.07
June 28 2010 Central Balances Construction £1,288.32
June 28 2010 Community & Environment Road Maintenance £1,209.50
June 28 2010 Community & Environment Road Maintenance £1,209.50
June 28 2010 Community & Environment Road Maintenance £1,146.51
June 28 2010 Community & Environment Road Maintenance £1,131.52
June 28 2010 Community & Environment Road Maintenance £1,131.51
June 28 2010 Community & Environment Road Maintenance £1,101.21
June 28 2010 Community & Environment Road Maintenance £1,094.34
June 28 2010 Community & Environment Road Maintenance £1,080.26
June 28 2010 Community & Environment Road Maintenance £1,074.71
June 28 2010 Community & Environment Road Maintenance £1,019.17
June 28 2010 Community & Environment Road Maintenance £975.68
June 28 2010 Central Balances Construction £925.89
June 28 2010 Central Balances Projs Non Lab Clearing Ac £917.63
June 28 2010 Central Balances Construction £890.98
June 28 2010 Community & Environment Road Maintenance £886.24
June 28 2010 Community & Environment Road Maintenance £864.69
June 28 2010 Community & Environment Road Maintenance £838.38
July 16 2010 Community & Environment Vehicle Repairs + Maint £622.29
July 21 2010 Community & Environment Rech for Overheads £1,128.15
July 21 2010 Community & Environment Road Maintenance £506.05
July 21 2010 Central Balances Construction £510.26
July 21 2010 Community & Environment Road Maintenance £523.84
July 21 2010 Community & Environment Road Maintenance £526.75
July 21 2010 Community & Environment Road Maintenance £531.88
July 21 2010 Community & Environment Road Maintenance £533.64
July 21 2010 Community & Environment Road Maintenance £549.00
July 21 2010 Community & Environment Road Maintenance £578.74
July 21 2010 Community & Environment Road Maintenance £580.38
July 21 2010 Community & Environment Rech for Overheads £586.73
July 21 2010 Central Balances Projs Non Lab Clearing Ac £609.59
July 21 2010 Central Balances Projs Non Lab Clearing Ac £609.59
July 21 2010 Central Balances Projs Non Lab Clearing Ac £609.59
July 21 2010 Central Balances Projs Non Lab Clearing Ac £609.59
July 21 2010 Community & Environment Road Maintenance £610.60
July 21 2010 Central Balances Projs Non Lab Clearing Ac £627.68
July 21 2010 Central Balances Projs Non Lab Clearing Ac £627.68
July 21 2010 Community & Environment Road Maintenance £629.21
July 21 2010 Community & Environment Rech for Overheads £629.30
July 21 2010 Community & Environment Road Maintenance £629.92
July 21 2010 Community & Environment Rech for Overheads £649.34
July 21 2010 Community & Environment Road Maintenance £667.38
July 21 2010 Community & Environment Road Maintenance £677.66
July 21 2010 Community & Environment Road Maintenance £685.87
July 21 2010 Central Balances Projs Non Lab Clearing Ac £689.22
July 21 2010 Central Balances Projs Non Lab Clearing Ac £689.73
July 21 2010 Central Balances Projs Non Lab Clearing Ac £689.73
July 21 2010 Central Balances Projs Non Lab Clearing Ac £689.73
July 21 2010 Central Balances Projs Non Lab Clearing Ac £689.73
July 21 2010 Central Balances Projs Non Lab Clearing Ac £689.73
July 21 2010 Central Balances Projs Non Lab Clearing Ac £689.73
July 21 2010 Central Balances Projs Non Lab Clearing Ac £689.73
July 21 2010 Central Balances Projs Non Lab Clearing Ac £689.73
July 21 2010 Central Balances Projs Non Lab Clearing Ac £689.73
July 21 2010 Central Balances Projs Non Lab Clearing Ac £689.73
July 21 2010 Central Balances Projs Non Lab Clearing Ac £689.73
July 21 2010 Community & Environment Road Maintenance £712.62
July 21 2010 Community & Environment Road Maintenance £718.24
July 21 2010 Community & Environment Road Maintenance £722.88
July 21 2010 Community & Environment Road Maintenance £748.38
July 21 2010 Community & Environment Road Maintenance £755.41
July 21 2010 Central Balances Projs Non Lab Clearing Ac £767.33
July 21 2010 Community & Environment Road Maintenance £799.12
July 21 2010 Central Balances Projs Non Lab Clearing Ac £900.76
July 21 2010 Central Balances Projs Non Lab Clearing Ac £941.53
July 21 2010 Central Balances Projs Non Lab Clearing Ac £941.53
July 21 2010 Central Balances Projs Non Lab Clearing Ac £941.53
July 21 2010 Central Balances Projs Non Lab Clearing Ac £941.53
July 21 2010 Central Balances Projs Non Lab Clearing Ac £941.53
July 21 2010 Central Balances Projs Non Lab Clearing Ac £941.53
July 21 2010 Central Balances Construction £987.89
July 21 2010 Community & Environment Road Maintenance £989.47
July 21 2010 Community & Environment Rech for Overheads £1,016.50
July 21 2010 Community & Environment Road Maintenance £1,029.75
July 21 2010 Community & Environment Rech for Overheads £1,038.12
July 21 2010 Community & Environment Road Maintenance £1,137.73
July 21 2010 Community & Environment Road Maintenance £1,139.74
July 21 2010 Community & Environment Road Maintenance £1,241.50
July 21 2010 Central Balances Construction £1,281.03
July 21 2010 Community & Environment Winter Maintenance £1,318.06
July 21 2010 Community & Environment Winter Maintenance £1,318.06
July 21 2010 Community & Environment Road Maintenance £1,328.77
July 21 2010 Community & Environment Road Maintenance £1,344.88
July 21 2010 Community & Environment Road Maintenance £1,345.75
July 21 2010 Central Balances Projs Non Lab Clearing Ac £1,386.43
July 21 2010 Central Balances Projs Non Lab Clearing Ac £1,468.89
July 21 2010 Central Balances Projs Non Lab Clearing Ac £1,556.55
July 21 2010 Community & Environment Road Maintenance £1,572.18
July 21 2010 Community & Environment Road Maintenance £1,609.03
July 21 2010 Central Balances Projs Non Lab Clearing Ac £1,704.18
July 21 2010 Community & Environment Road Maintenance £1,833.90
July 21 2010 Community & Environment Road Maintenance £1,863.42
July 21 2010 Community & Environment Road Maintenance £1,873.20
July 21 2010 Community & Environment Road Maintenance £1,898.27
July 21 2010 Community & Environment Road Maintenance £1,901.24
July 21 2010 Community & Environment Road Maintenance £1,910.76
July 21 2010 Community & Environment Road Maintenance £2,015.41
July 21 2010 Community & Environment Rech for Overheads £2,020.23
July 21 2010 Central Balances Projs Non Lab Clearing Ac £2,033.95
July 21 2010 Community & Environment Road Maintenance £2,053.76
July 21 2010 Community & Environment Road Maintenance £2,109.83
July 21 2010 Community & Environment Road Maintenance £2,129.53
July 21 2010 Community & Environment Road Maintenance £2,133.90
July 21 2010 Community & Environment Road Maintenance £2,163.98
July 21 2010 Central Balances Projs Non Lab Clearing Ac £2,223.57
July 21 2010 Community & Environment Road Maintenance £2,287.23
July 21 2010 Community & Environment Road Maintenance £2,338.71
July 21 2010 Central Balances Projs Non Lab Clearing Ac £2,372.13
July 21 2010 Community & Environment Road Maintenance £2,403.81
July 21 2010 Community & Environment Road Maintenance £2,415.18
July 21 2010 Community & Environment Road Maintenance £2,462.92
July 21 2010 Community & Environment Road Maintenance £2,509.96
July 21 2010 Community & Environment Road Maintenance £2,581.70
July 21 2010 Community & Environment Road Maintenance £2,582.26
July 21 2010 Community & Environment Road Maintenance £2,587.30
July 21 2010 Community & Environment Road Maintenance £2,592.36
July 21 2010 Community & Environment Road Maintenance £2,640.10
July 21 2010 Community & Environment Road Maintenance £2,675.89
July 21 2010 Community & Environment Road Maintenance £2,795.97
July 21 2010 Community & Environment Road Maintenance £2,819.60
July 21 2010 Community & Environment Road Maintenance £2,845.44
July 21 2010 Community & Environment Road Maintenance £2,858.00
July 21 2010 Community & Environment Road Maintenance £2,910.22
July 21 2010 Community & Environment Road Maintenance £2,910.85
July 21 2010 Community & Environment Road Maintenance £2,912.98
July 21 2010 Community & Environment Road Maintenance £2,930.12
July 21 2010 Central Balances Projs Non Lab Clearing Ac £2,935.85
July 21 2010 Community & Environment Road Maintenance £2,947.63
July 21 2010 Community & Environment Road Maintenance £2,948.13
July 21 2010 Community & Environment Road Maintenance £2,956.34
July 21 2010 Community & Environment Road Maintenance £2,982.06
July 21 2010 Community & Environment Road Maintenance £3,023.61
July 21 2010 Community & Environment Road Maintenance £3,033.81
July 21 2010 Community & Environment Road Maintenance £3,041.34
July 21 2010 Community & Environment Road Maintenance £3,060.28
July 21 2010 Community & Environment Road Maintenance £3,072.73
July 21 2010 Community & Environment Road Maintenance £3,164.09
July 21 2010 Community & Environment Road Maintenance £3,190.51
July 21 2010 Community & Environment Road Maintenance £3,248.87
July 21 2010 Central Balances Construction £3,283.79
July 21 2010 Community & Environment Road Maintenance £3,329.80
July 21 2010 Community & Environment Road Maintenance £3,353.35
July 21 2010 Community & Environment Road Maintenance £3,394.53
July 21 2010 Community & Environment Road Maintenance £3,649.23
July 21 2010 Community & Environment Road Maintenance £3,669.87
July 21 2010 Central Balances Projs Non Lab Clearing Ac £3,678.45
July 21 2010 Community & Environment Road Maintenance £3,717.76
July 21 2010 Community & Environment Road Maintenance £3,757.83
July 21 2010 Community & Environment Road Maintenance £3,852.33
July 21 2010 Community & Environment Road Maintenance £4,005.07
July 21 2010 Community & Environment Road Maintenance £4,033.12
July 21 2010 Community & Environment Road Maintenance £4,071.74
July 21 2010 Community & Environment Road Maintenance £4,096.46
July 21 2010 Community & Environment Road Maintenance £4,157.50
July 21 2010 Central Balances Projs Non Lab Clearing Ac £4,303.72
July 21 2010 Community & Environment Road Maintenance £4,404.51
July 21 2010 Community & Environment Road Maintenance £4,639.44
July 21 2010 Community & Environment Road Maintenance £4,760.69
July 21 2010 Central Balances Projs Non Lab Clearing Ac £4,955.44
July 21 2010 Community & Environment Road Maintenance £5,232.41
July 21 2010 Community & Environment Rech for Overheads £5,235.29
July 21 2010 Community & Environment Road Maintenance £6,029.19
July 21 2010 Central Balances Projs Non Lab Clearing Ac £6,053.21
July 21 2010 Community & Environment Road Maintenance £6,241.82
July 21 2010 Community & Environment Road Maintenance £6,474.69
July 21 2010 Central Balances Projs Non Lab Clearing Ac £6,690.01
July 21 2010 Community & Environment Road Maintenance £6,699.68
July 21 2010 Community & Environment Road Maintenance £7,252.00
July 21 2010 Central Balances Construction £7,315.72
July 21 2010 Central Balances Projs Non Lab Clearing Ac £7,828.16
July 21 2010 Community & Environment Road Maintenance £8,627.91
July 21 2010 Community & Environment Road Maintenance £8,739.69
July 21 2010 Community & Environment Road Maintenance £10,261.07
July 21 2010 Community & Environment Road Maintenance £10,420.52
July 21 2010 Central Balances Projs Non Lab Clearing Ac £10,825.80
July 21 2010 Central Balances Projs Non Lab Clearing Ac £11,843.44
July 21 2010 Central Balances Projs Non Lab Clearing Ac £13,140.17
July 21 2010 Central Balances Projs Non Lab Clearing Ac £13,246.01
July 21 2010 Community & Environment Road Maintenance £13,385.19
July 21 2010 Central Balances Projs Non Lab Clearing Ac £14,227.86
July 21 2010 Central Balances Projs Non Lab Clearing Ac £14,320.44
July 21 2010 Community & Environment Road Maintenance £14,745.95
July 21 2010 Central Balances Construction £15,106.96
July 21 2010 Central Balances Projs Non Lab Clearing Ac £15,734.07
July 21 2010 Central Balances Projs Non Lab Clearing Ac £15,983.62
July 21 2010 Central Balances Projs Non Lab Clearing Ac £16,017.28
July 21 2010 Central Balances Projs Non Lab Clearing Ac £16,086.99
July 21 2010 Central Balances Projs Non Lab Clearing Ac £17,627.14
July 21 2010 Central Balances Projs Non Lab Clearing Ac £18,207.13
July 21 2010 Central Balances Projs Non Lab Clearing Ac £19,197.03
July 21 2010 Central Balances Projs Non Lab Clearing Ac £19,427.28
July 21 2010 Community & Environment Road Maintenance £20,071.49
July 21 2010 Central Balances Projs Non Lab Clearing Ac £20,689.07
July 21 2010 Community & Environment Road Maintenance £23,797.44
July 21 2010 Community & Environment Road Maintenance £24,966.40
July 21 2010 Community & Environment Road Maintenance £26,530.96
July 21 2010 Central Balances Projs Non Lab Clearing Ac £27,409.92
July 21 2010 Community & Environment Road Maintenance £31,678.36
July 21 2010 Central Balances Projs Non Lab Clearing Ac £34,030.94
July 21 2010 Central Balances Projs Non Lab Clearing Ac £34,274.49
July 21 2010 Central Balances Projs Non Lab Clearing Ac £46,351.07
July 21 2010 Community & Environment Road Maintenance £62,993.88
July 22 2010 Community & Environment Fuel £2,243.73
July 22 2010 Community & Environment Fuel £568.09
July 23 2010 Community & Environment Vehicle Hire £575.75
July 30 2010 Community & Environment Vehicle Repairs + Maint £2,089.00
August 4 2010 Community & Environment Vehicle Repairs + Maint £540.31
August 4 2010 Community & Environment Fuel £1,650.79
August 6 2010 Community & Environment Vehicle Repairs + Maint £1,530.77
August 12 2010 Community & Environment Vehicle Repairs + Maint £833.56
August 12 2010 Community & Environment Vehicle Repairs + Maint £535.65
August 19 2010 Community & Environment Vehicle Repairs + Maint £10,000.00
August 20 2010 Central Balances Projs Non Lab Clearing Ac £6,412.63
August 20 2010 Community & Environment Road Maintenance £6,525.61
August 20 2010 Central Balances Projs Non Lab Clearing Ac £6,838.11
August 20 2010 Central Balances Construction £6,919.18
August 20 2010 Community & Environment Road Maintenance £7,132.27
August 20 2010 Community & Environment Road Maintenance £7,171.24
August 20 2010 Central Balances Projs Non Lab Clearing Ac £7,434.76
August 20 2010 Community & Environment Road Maintenance £7,484.06
August 20 2010 Central Balances Projs Non Lab Clearing Ac £7,656.91
August 20 2010 Community & Environment Road Maintenance £7,978.35
August 20 2010 Community & Environment Road Maintenance £8,668.33
August 20 2010 Central Balances Projs Non Lab Clearing Ac £8,762.94
August 20 2010 Central Balances Projs Non Lab Clearing Ac £8,780.04
August 20 2010 Central Balances Projs Non Lab Clearing Ac £8,912.67
August 20 2010 Central Balances Projs Non Lab Clearing Ac £8,976.26
August 20 2010 Central Balances Projs Non Lab Clearing Ac £9,226.44
August 20 2010 Community & Environment Road Maintenance £9,694.76
August 20 2010 Central Balances Projs Non Lab Clearing Ac £10,518.79
August 20 2010 Community & Environment Road Maintenance £10,546.03
August 20 2010 Community & Environment Road Maintenance £10,591.46
August 20 2010 Central Balances Projs Non Lab Clearing Ac £11,506.13
August 20 2010 Central Balances Projs Non Lab Clearing Ac £11,626.44
August 20 2010 Central Balances Projs Non Lab Clearing Ac £12,580.62
August 20 2010 Central Balances Projs Non Lab Clearing Ac £12,757.83
August 20 2010 Central Balances Projs Non Lab Clearing Ac £13,375.35
August 20 2010 Community & Environment Road Maintenance £13,447.88
August 20 2010 Central Balances Projs Non Lab Clearing Ac £13,782.08
August 20 2010 Central Balances Projs Non Lab Clearing Ac £13,803.76
August 20 2010 Central Balances Projs Non Lab Clearing Ac £14,326.94
August 20 2010 Community & Environment Road Maintenance £14,847.00
August 20 2010 Central Balances Projs Non Lab Clearing Ac £15,274.10
August 20 2010 Community & Environment Vehicle Repairs + Maint £15,889.68
August 20 2010 Central Balances Projs Non Lab Clearing Ac £16,290.10
August 20 2010 Central Balances Projs Non Lab Clearing Ac £16,380.53
August 20 2010 Central Balances Projs Non Lab Clearing Ac £16,535.10
August 20 2010 Central Balances Projs Non Lab Clearing Ac £18,163.01
August 20 2010 Central Balances Construction £18,455.21
August 20 2010 Central Balances Projs Non Lab Clearing Ac £18,749.64
August 20 2010 Central Balances Projs Non Lab Clearing Ac £19,201.95
August 20 2010 Central Balances Construction £19,495.74
August 20 2010 Central Balances Projs Non Lab Clearing Ac £19,548.29
August 20 2010 Community & Environment Road Maintenance £19,573.09
August 20 2010 Central Balances Projs Non Lab Clearing Ac £19,834.13
August 20 2010 Community & Environment Road Maintenance £20,165.72
August 20 2010 Central Balances Projs Non Lab Clearing Ac £20,279.29
August 20 2010 Central Balances Projs Non Lab Clearing Ac £22,094.40
August 20 2010 Central Balances Projs Non Lab Clearing Ac £22,211.02
August 20 2010 Central Balances Projs Non Lab Clearing Ac £23,742.71
August 20 2010 Central Balances Projs Non Lab Clearing Ac £23,779.57
August 20 2010 Community & Environment Road Maintenance £23,909.18
August 20 2010 Central Balances Projs Non Lab Clearing Ac £24,878.13
August 20 2010 Community & Environment Road Maintenance £25,083.61
August 20 2010 Community & Environment Road Maintenance £26,655.54
August 20 2010 Central Balances Projs Non Lab Clearing Ac £30,048.40
August 20 2010 Central Balances Projs Non Lab Clearing Ac £30,828.43
August 20 2010 Community & Environment Road Maintenance £31,827.11
August 20 2010 Central Balances Construction £35,889.53
August 20 2010 Central Balances Projs Non Lab Clearing Ac £37,300.59
August 20 2010 Central Balances Projs Non Lab Clearing Ac £40,174.41
August 20 2010 Central Balances Projs Non Lab Clearing Ac £42,564.16
August 20 2010 Central Balances Projs Non Lab Clearing Ac £43,884.12
August 20 2010 Central Balances Projs Non Lab Clearing Ac £63,363.26
August 20 2010 Central Balances Projs Non Lab Clearing Ac £63,690.24
August 20 2010 Community & Environment Road Maintenance £4,787.38
August 20 2010 Central Balances Projs Non Lab Clearing Ac £4,741.69
August 20 2010 Community & Environment Road Maintenance £4,661.22
August 20 2010 Community & Environment Road Maintenance £4,599.46
August 20 2010 Community & Environment Road Maintenance £4,457.56
August 20 2010 Central Balances Construction £4,430.17
August 20 2010 Community & Environment Road Maintenance £4,066.41
August 20 2010 Community & Environment Road Maintenance £4,061.36
August 20 2010 Community & Environment Road Maintenance £4,006.63
August 20 2010 Community & Environment Road Maintenance £3,891.35
August 20 2010 Community & Environment Road Maintenance £3,886.79
August 20 2010 Community & Environment Road Maintenance £3,876.64
August 20 2010 Community & Environment Road Maintenance £3,849.93
August 20 2010 Central Balances Construction £3,742.42
August 20 2010 Central Balances Projs Non Lab Clearing Ac £3,522.81
August 20 2010 Community & Environment Road Maintenance £3,471.28
August 20 2010 Community & Environment Road Maintenance £3,462.63
August 20 2010 Central Balances Construction £3,422.50
August 20 2010 Community & Environment Road Maintenance £3,349.81
August 20 2010 Community & Environment Road Maintenance £3,304.34
August 20 2010 Community & Environment Road Maintenance £3,294.66
August 20 2010 Community & Environment Road Maintenance £3,283.04
August 20 2010 Community & Environment Road Maintenance £3,282.93
August 20 2010 Community & Environment Road Maintenance £3,203.07
August 20 2010 Community & Environment Road Maintenance £3,186.97
August 20 2010 Community & Environment Road Maintenance £3,168.35
August 20 2010 Community & Environment Road Maintenance £3,164.86
August 20 2010 Community & Environment Road Maintenance £3,136.40
August 20 2010 Community & Environment Road Maintenance £3,119.63
August 20 2010 Community & Environment Road Maintenance £3,117.18
August 20 2010 Central Balances Projs Non Lab Clearing Ac £3,116.70
August 20 2010 Central Balances Construction £3,089.26
August 20 2010 Community & Environment Road Maintenance £3,054.58
August 20 2010 Community & Environment Road Maintenance £3,041.35
August 20 2010 Community & Environment Road Maintenance £2,995.62
August 20 2010 Community & Environment Road Maintenance £2,976.99
August 20 2010 Community & Environment Road Maintenance £2,871.41
August 20 2010 Central Balances Projs Non Lab Clearing Ac £2,861.82
August 20 2010 Community & Environment Road Maintenance £2,860.65
August 20 2010 Community & Environment Road Maintenance £2,828.25
August 20 2010 Central Balances Projs Non Lab Clearing Ac £2,805.94
August 20 2010 Community & Environment Road Maintenance £2,782.36
August 20 2010 Community & Environment Road Maintenance £2,759.94
August 20 2010 Community & Environment Road Maintenance £2,734.37
August 20 2010 Community & Environment Road Maintenance £2,721.04
August 20 2010 Central Balances Projs Non Lab Clearing Ac £2,704.41
August 20 2010 Community & Environment Road Maintenance £2,704.13
August 20 2010 Community & Environment Road Maintenance £2,695.96
August 20 2010 Central Balances Projs Non Lab Clearing Ac £2,681.24
August 20 2010 Community & Environment Road Maintenance £2,659.93
August 20 2010 Community & Environment Road Maintenance £2,641.93
August 20 2010 Community & Environment Road Maintenance £2,622.17
August 20 2010 Central Balances Construction £2,618.02
August 20 2010 Community & Environment Road Maintenance £2,601.96
August 20 2010 Community & Environment Road Maintenance £2,597.26
August 20 2010 Community & Environment Road Maintenance £2,594.08
August 20 2010 Community & Environment Road Maintenance £2,583.40
August 20 2010 Community & Environment Road Maintenance £2,525.41
August 20 2010 Community & Environment Road Maintenance £2,518.48
August 20 2010 Community & Environment Road Maintenance £2,511.34
August 20 2010 Community & Environment Road Maintenance £2,458.52
August 20 2010 Central Balances Projs Non Lab Clearing Ac £2,439.18
August 20 2010 Community & Environment Road Maintenance £2,431.73
August 20 2010 Community & Environment Road Maintenance £2,419.84
August 20 2010 Community & Environment Road Maintenance £2,398.50
August 20 2010 Community & Environment Road Maintenance £2,397.58
August 20 2010 Community & Environment Road Maintenance £2,368.59
August 20 2010 Community & Environment Road Maintenance £2,356.59
August 20 2010 Community & Environment Road Maintenance £2,352.66
August 20 2010 Community & Environment Road Maintenance £2,334.00
August 20 2010 Community & Environment Road Maintenance £2,301.57
August 20 2010 Community & Environment Road Maintenance £2,268.34
August 20 2010 Community & Environment Road Maintenance £2,263.96
August 20 2010 Community & Environment Road Maintenance £2,235.93
August 20 2010 Community & Environment Road Maintenance £2,235.67
August 20 2010 Community & Environment Road Maintenance £2,220.56
August 20 2010 Community & Environment Road Maintenance £2,216.13
August 20 2010 Community & Environment Road Maintenance £2,199.09
August 20 2010 Community & Environment Road Maintenance £2,155.51
August 20 2010 Community & Environment Road Maintenance £2,148.71
August 20 2010 Community & Environment Road Maintenance £2,146.90
August 20 2010 Community & Environment Road Maintenance £2,135.06
August 20 2010 Community & Environment Road Maintenance £2,134.57
August 20 2010 Community & Environment Road Maintenance £2,114.54
August 20 2010 Community & Environment Road Maintenance £2,094.01
August 20 2010 Community & Environment Road Maintenance £2,061.92
August 20 2010 Community & Environment Road Maintenance £2,053.75
August 20 2010 Community & Environment Road Maintenance £2,039.65
August 20 2010 Community & Environment Road Maintenance £2,035.93
August 20 2010 Community & Environment Road Maintenance £2,005.03
August 20 2010 Community & Environment Road Maintenance £1,998.58
August 20 2010 Community & Environment Road Maintenance £1,998.58
August 20 2010 Community & Environment Road Maintenance £1,993.28
August 20 2010 Community & Environment Road Maintenance £1,967.40
August 20 2010 Community & Environment Road Maintenance £1,964.97
August 20 2010 Community & Environment Road Maintenance £1,964.97
August 20 2010 Community & Environment Road Maintenance £1,958.82
August 20 2010 Community & Environment Road Maintenance £1,950.02
August 20 2010 Community & Environment Road Maintenance £1,934.99
August 20 2010 Community & Environment Road Maintenance £1,932.28
August 20 2010 Community & Environment Road Maintenance £1,927.08
August 20 2010 Community & Environment Road Maintenance £1,927.08
August 20 2010 Community & Environment Road Maintenance £1,919.79
August 20 2010 Community & Environment Road Maintenance £1,919.79
August 20 2010 Community & Environment Road Maintenance £1,918.65
August 20 2010 Community & Environment Road Maintenance £1,915.10
August 20 2010 Community & Environment Road Maintenance £1,915.10
August 20 2010 Community & Environment Road Maintenance £1,913.71
August 20 2010 Community & Environment Road Maintenance £1,913.71
August 20 2010 Central Balances Projs Non Lab Clearing Ac £1,903.42
August 20 2010 Community & Environment Road Maintenance £1,882.50
August 20 2010 Community & Environment Road Maintenance £1,879.40
August 20 2010 Community & Environment Road Maintenance £1,875.96
August 20 2010 Community & Environment Road Maintenance £1,861.09
August 20 2010 Community & Environment Road Maintenance £1,848.63
August 20 2010 Community & Environment Road Maintenance £1,840.55
August 20 2010 Community & Environment Road Maintenance £1,837.18
August 20 2010 Community & Environment Road Maintenance £1,832.72
August 20 2010 Community & Environment Road Maintenance £1,822.77
August 20 2010 Community & Environment Road Maintenance £1,808.17
August 20 2010 Community & Environment Road Maintenance £1,793.92
August 20 2010 Community & Environment Road Maintenance £1,760.80
August 20 2010 Community & Environment Road Maintenance £1,760.80
August 20 2010 Central Balances Construction £1,677.86
August 20 2010 Community & Environment Road Maintenance £1,659.37
August 20 2010 Community & Environment Road Maintenance £1,638.15
August 20 2010 Community & Environment Road Maintenance £1,637.24
August 20 2010 Community & Environment Road Maintenance £1,593.22
August 20 2010 Community & Environment Road Maintenance £1,590.52
August 20 2010 Community & Environment Road Maintenance £1,579.54
August 20 2010 Community & Environment Road Maintenance £1,564.02
August 20 2010 Community & Environment Road Maintenance £1,555.66
August 20 2010 Community & Environment Road Maintenance £1,542.38
August 20 2010 Community & Environment Road Maintenance £1,536.47
August 20 2010 Community & Environment Road Maintenance £1,527.13
August 20 2010 Central Balances Construction £1,523.48
August 20 2010 Community & Environment Road Maintenance £1,520.20
August 20 2010 Community & Environment Road Maintenance £1,516.97
August 20 2010 Community & Environment Road Maintenance £1,507.22
August 20 2010 Community & Environment Road Maintenance £1,501.96
August 20 2010 Community & Environment Road Maintenance £1,496.85
August 20 2010 Community & Environment Road Maintenance £1,483.13
August 20 2010 Community & Environment Road Maintenance £1,425.56
August 20 2010 Community & Environment Road Maintenance £1,415.10
August 20 2010 Community & Environment Road Maintenance £1,409.84
August 20 2010 Central Balances Projs Non Lab Clearing Ac £1,409.01
August 20 2010 Community & Environment Road Maintenance £1,386.26
August 20 2010 Central Balances Projs Non Lab Clearing Ac £1,368.84
August 20 2010 Community & Environment Road Maintenance £1,355.93
August 20 2010 Community & Environment Road Maintenance £1,330.93
August 20 2010 Community & Environment Road Maintenance £1,329.35
August 20 2010 Community & Environment Road Maintenance £1,324.78
August 20 2010 Community & Environment Rech for Overheads £1,323.26
August 20 2010 Community & Environment Road Maintenance £1,320.72
August 20 2010 Central Balances Projs Non Lab Clearing Ac £1,309.99
August 20 2010 Central Balances Construction £1,245.64
August 20 2010 Community & Environment Road Maintenance £1,204.85
August 20 2010 Community & Environment Road Maintenance £1,201.31
August 20 2010 Community & Environment Road Maintenance £1,200.42
August 20 2010 Community & Environment Road Maintenance £1,186.45
August 20 2010 Community & Environment Road Maintenance £1,185.43
August 20 2010 Central Balances Projs Non Lab Clearing Ac £1,145.93
August 20 2010 Community & Environment Road Maintenance £1,139.74
August 20 2010 Community & Environment Road Maintenance £1,100.43
August 20 2010 Community & Environment Road Maintenance £1,094.55
August 20 2010 Community & Environment Road Maintenance £1,091.18
August 20 2010 Community & Environment Road Maintenance £1,089.92
August 20 2010 Community & Environment Road Maintenance £1,068.92
August 20 2010 Central Balances Construction £1,056.33
August 20 2010 Central Balances Projs Non Lab Clearing Ac £1,045.15
August 20 2010 Community & Environment Road Maintenance £1,000.81
August 20 2010 Community & Environment Road Maintenance £979.42
August 20 2010 Community & Environment Road Maintenance £971.16
August 20 2010 Community & Environment Road Maintenance £971.16
August 20 2010 Community & Environment Road Maintenance £966.29
August 20 2010 Community & Environment Road Maintenance £948.56
August 20 2010 Community & Environment Road Maintenance £934.22
August 20 2010 Community & Environment Road Maintenance £928.03
August 20 2010 Community & Environment Road Maintenance £925.93
August 20 2010 Community & Environment Road Maintenance £909.78
August 20 2010 Community & Environment Road Maintenance £904.46
August 20 2010 Community & Environment Road Maintenance £883.99
August 20 2010 Community & Environment Road Maintenance £878.81
August 20 2010 Community & Environment Road Maintenance £877.31
August 20 2010 Community & Environment Road Maintenance £831.97
August 20 2010 Community & Environment Road Maintenance £827.21
August 20 2010 Community & Environment Road Maintenance £825.60
August 20 2010 Community & Environment Rech for Overheads £808.69
August 20 2010 Community & Environment Road Maintenance £798.61
August 20 2010 Community & Environment Road Maintenance £787.89
August 20 2010 Community & Environment Road Maintenance £780.42
August 20 2010 Community & Environment Rech for Overheads £774.99
August 20 2010 Central Balances Projs Non Lab Clearing Ac £770.50
August 20 2010 Central Balances Projs Non Lab Clearing Ac £770.50
August 20 2010 Central Balances Projs Non Lab Clearing Ac £770.50
August 20 2010 Central Balances Projs Non Lab Clearing Ac £770.50
August 20 2010 Central Balances Projs Non Lab Clearing Ac £770.50
August 20 2010 Central Balances Projs Non Lab Clearing Ac £770.50
August 20 2010 Central Balances Projs Non Lab Clearing Ac £770.50
August 20 2010 Central Balances Projs Non Lab Clearing Ac £770.50
August 20 2010 Central Balances Projs Non Lab Clearing Ac £770.50
August 20 2010 Central Balances Projs Non Lab Clearing Ac £770.50
August 20 2010 Central Balances Projs Non Lab Clearing Ac £770.50
August 20 2010 Central Balances Projs Non Lab Clearing Ac £770.50
August 20 2010 Central Balances Projs Non Lab Clearing Ac £770.50
August 20 2010 Central Balances Projs Non Lab Clearing Ac £770.50
August 20 2010 Central Balances Projs Non Lab Clearing Ac £770.50
August 20 2010 Central Balances Projs Non Lab Clearing Ac £770.50
August 20 2010 Central Balances Projs Non Lab Clearing Ac £770.50
August 20 2010 Central Balances Projs Non Lab Clearing Ac £770.50
August 20 2010 Central Balances Projs Non Lab Clearing Ac £770.50
August 20 2010 Central Balances Projs Non Lab Clearing Ac £770.50
August 20 2010 Central Balances Projs Non Lab Clearing Ac £770.50
August 20 2010 Central Balances Projs Non Lab Clearing Ac £770.50
August 20 2010 Community & Environment Rech for Overheads £763.04
August 20 2010 Community & Environment Road Maintenance £761.50
August 20 2010 Community & Environment Road Maintenance £759.73
August 20 2010 Central Balances Projs Non Lab Clearing Ac £737.91
August 20 2010 Community & Environment Road Maintenance £726.14
August 20 2010 Community & Environment Road Maintenance £721.64
August 20 2010 Central Balances Projs Non Lab Clearing Ac £708.43
August 20 2010 Community & Environment Road Maintenance £708.07
August 20 2010 Community & Environment Road Maintenance £706.69
August 20 2010 Community & Environment Road Maintenance £693.70
August 20 2010 Community & Environment Road Maintenance £690.06
August 20 2010 Central Balances Projs Non Lab Clearing Ac £689.73
August 20 2010 Community & Environment Road Maintenance £688.68
August 20 2010 Community & Environment Road Maintenance £684.67
August 20 2010 Community & Environment Road Maintenance £680.97
August 20 2010 Community & Environment Road Maintenance £675.53
August 20 2010 Community & Environment Road Maintenance £669.05
August 20 2010 Community & Environment Road Maintenance £651.14
August 20 2010 Community & Environment Rech for Overheads £635.67
August 20 2010 Community & Environment Rech for Overheads £609.80
August 20 2010 Central Balances Projs Non Lab Clearing Ac £599.99
August 20 2010 Community & Environment Road Maintenance £595.04
August 20 2010 Central Balances Projs Non Lab Clearing Ac £591.79
August 20 2010 Community & Environment Road Maintenance £575.96
August 20 2010 Community & Environment Road Maintenance £569.66
August 20 2010 Community & Environment Road Maintenance £560.19
August 20 2010 Community & Environment Road Maintenance £553.09
August 20 2010 Community & Environment Road Maintenance £548.91
August 20 2010 Community & Environment Road Maintenance £546.52
August 20 2010 Central Balances Projs Non Lab Clearing Ac £539.50
August 20 2010 Central Balances Projs Non Lab Clearing Ac £539.41
August 20 2010 Central Balances Projs Non Lab Clearing Ac £539.41
August 20 2010 Central Balances Projs Non Lab Clearing Ac £539.41
August 20 2010 Central Balances Projs Non Lab Clearing Ac £539.41
August 20 2010 Community & Environment Road Maintenance £535.61
August 20 2010 Community & Environment Road Maintenance £533.47
August 20 2010 Community & Environment Road Maintenance £4,819.31
August 20 2010 Community & Environment Road Maintenance £5,147.37
August 20 2010 Central Balances Projs Non Lab Clearing Ac £5,473.64
August 20 2010 Community & Environment Road Maintenance £5,762.01
August 20 2010 Community & Environment Road Maintenance £5,814.18
August 20 2010 Community & Environment Road Maintenance £5,892.10
August 20 2010 Community & Environment Road Maintenance £6,041.92
August 20 2010 Central Balances Projs Non Lab Clearing Ac £6,043.89
August 20 2010 Central Balances Construction £6,077.54
August 20 2010 Community & Environment Road Maintenance £6,314.76
August 20 2010 Community & Environment Road Maintenance £4,861.78
September 1 2010 Community & Environment Vehicle Repairs + Maint £3,480.80
September 1 2010 Community & Environment Vehicle Repairs + Maint £522.20
September 3 2010 Community & Environment Vehicle Repairs + Maint £581.58
September 3 2010 Community & Environment Vehicle Repairs + Maint £535.12
September 4 2010 Community & Environment Vehicle Repairs + Maint £1,288.40
September 16 2010 Community & Environment Road Maintenance £2,109.53
September 16 2010 Community & Environment Road Maintenance £2,073.75
September 16 2010 Community & Environment Road Maintenance £1,994.70
September 16 2010 Central Balances Projs Non Lab Clearing Ac £1,975.86
September 16 2010 Central Balances Construction £1,924.76
September 16 2010 Central Balances Projs Non Lab Clearing Ac £1,910.63
September 16 2010 Central Balances Construction £1,900.89
September 16 2010 Community & Environment Road Maintenance £1,889.84
September 16 2010 Central Balances Projs Non Lab Clearing Ac £1,793.12
September 16 2010 Community & Environment Road Maintenance £1,793.10
September 16 2010 Central Balances Projs Non Lab Clearing Ac £1,746.95
September 16 2010 Community & Environment Road Maintenance £1,738.08
September 16 2010 Central Balances Projs Non Lab Clearing Ac £1,730.14
September 16 2010 Community & Environment Road Maintenance £1,626.39
September 16 2010 Central Balances Projs Non Lab Clearing Ac £1,600.70
September 16 2010 Community & Environment Road Maintenance £1,581.50
September 16 2010 Central Balances Projs Non Lab Clearing Ac £1,560.23
September 16 2010 Community & Environment Road Maintenance £1,489.71
September 16 2010 Community & Environment Road Maintenance £1,395.71
September 16 2010 Community & Environment Road Maintenance £1,394.43
September 16 2010 Central Balances Projs Non Lab Clearing Ac £1,387.05
September 16 2010 Community & Environment Road Maintenance £1,376.22
September 16 2010 Central Balances Projs Non Lab Clearing Ac £1,373.66
September 16 2010 Community & Environment Road Maintenance £1,353.77
September 16 2010 Community & Environment Winter Maintenance £1,325.88
September 16 2010 Community & Environment Winter Maintenance £1,325.88
September 16 2010 Community & Environment Road Maintenance £1,292.46
September 16 2010 Community & Environment Road Maintenance £1,277.25
September 16 2010 Central Balances Projs Non Lab Clearing Ac £1,258.11
September 16 2010 Community & Environment Road Maintenance £1,183.77
September 16 2010 Community & Environment Road Maintenance £1,146.53
September 16 2010 Community & Environment Road Maintenance £1,145.09
September 16 2010 Community & Environment Road Maintenance £1,145.09
September 16 2010 Central Balances Projs Non Lab Clearing Ac £1,110.48
September 16 2010 Central Balances Projs Non Lab Clearing Ac £1,101.99
September 16 2010 Central Balances Projs Non Lab Clearing Ac £974.94
September 16 2010 Community & Environment Road Maintenance £971.66
September 16 2010 Central Balances Projs Non Lab Clearing Ac £958.71
September 16 2010 Community & Environment Rech for Overheads £958.48
September 16 2010 Community & Environment Road Maintenance £952.30
September 16 2010 Central Balances Projs Non Lab Clearing Ac £947.58
September 16 2010 Community & Environment Road Maintenance £854.40
September 16 2010 Community & Environment Road Maintenance £842.37
September 16 2010 Community & Environment Road Maintenance £816.41
September 16 2010 Community & Environment Road Maintenance £815.35
September 16 2010 Community & Environment Road Maintenance £793.66
September 16 2010 Community & Environment Road Maintenance £786.05
September 16 2010 Central Balances Construction £775.36
September 16 2010 Community & Environment Road Maintenance £761.50
September 16 2010 Central Balances Projs Non Lab Clearing Ac £748.61
September 16 2010 Community & Environment Road Maintenance £747.33
September 16 2010 Central Balances Projs Non Lab Clearing Ac £725.25
September 16 2010 Community & Environment Road Maintenance £713.38
September 16 2010 Community & Environment Road Maintenance £692.72
September 16 2010 Community & Environment Road Maintenance £691.59
September 16 2010 Central Balances Projs Non Lab Clearing Ac £683.81
September 16 2010 Community & Environment Road Maintenance £663.27
September 16 2010 Community & Environment Road Maintenance £647.49
September 16 2010 Community & Environment Road Maintenance £647.21
September 16 2010 Community & Environment Road Maintenance £640.83
September 16 2010 Central Balances Projs Non Lab Clearing Ac £630.38
September 16 2010 Community & Environment Rech for Overheads £624.03
September 16 2010 Community & Environment Road Maintenance £595.04
September 16 2010 Community & Environment Road Maintenance £582.63
September 16 2010 Community & Environment Vehicle Repairs + Maint £575.41
September 16 2010 Community & Environment Road Maintenance £557.41
September 16 2010 Community & Environment Road Maintenance £552.67
September 16 2010 Community & Environment Road Maintenance £546.10
September 16 2010 Community & Environment Road Maintenance £539.08
September 16 2010 Central Balances Construction £519.23
September 16 2010 Central Balances Projs Non Lab Clearing Ac £501.46
September 16 2010 Community & Environment Road Maintenance £500.57
September 16 2010 Central Balances Projs Non Lab Clearing Ac £55,807.88
September 16 2010 Central Balances Construction £48,300.71
September 16 2010 Central Balances Projs Non Lab Clearing Ac £35,930.81
September 16 2010 Central Balances Projs Non Lab Clearing Ac £35,890.26
September 16 2010 Community & Environment Road Maintenance £34,201.80
September 16 2010 Community & Environment Road Maintenance £31,867.07
September 16 2010 Central Balances Projs Non Lab Clearing Ac £29,715.16
September 16 2010 Central Balances Projs Non Lab Clearing Ac £28,597.90
September 16 2010 Central Balances Projs Non Lab Clearing Ac £27,243.80
September 16 2010 Community & Environment Road Maintenance £26,689.01
September 16 2010 Community & Environment Road Maintenance £25,115.11
September 16 2010 Central Balances Projs Non Lab Clearing Ac £24,496.93
September 16 2010 Community & Environment Road Maintenance £23,939.21
September 16 2010 Central Balances Projs Non Lab Clearing Ac £22,476.84
September 16 2010 Central Balances Projs Non Lab Clearing Ac £21,643.89
September 16 2010 Community & Environment Road Maintenance £20,191.04
September 16 2010 Community & Environment Road Maintenance £13,464.53
September 16 2010 Central Balances Projs Non Lab Clearing Ac £11,742.17
September 16 2010 Central Balances Projs Non Lab Clearing Ac £11,264.23
September 16 2010 Community & Environment Road Maintenance £10,559.56
September 16 2010 Central Balances Projs Non Lab Clearing Ac £10,397.16
September 16 2010 Central Balances Projs Non Lab Clearing Ac £9,340.75
September 16 2010 Central Balances Projs Non Lab Clearing Ac £9,141.02
September 16 2010 Community & Environment Road Maintenance £8,679.06
September 16 2010 Central Balances Projs Non Lab Clearing Ac £8,673.30
September 16 2010 Community & Environment Road Maintenance £8,650.30
September 16 2010 Community & Environment Road Maintenance £7,365.54
September 16 2010 Community & Environment Winter Maintenance £6,903.36
September 16 2010 Community & Environment Road Maintenance £6,813.41
September 16 2010 Community & Environment Winter Maintenance £6,617.24
September 16 2010 Central Balances Projs Non Lab Clearing Ac £6,606.19
September 16 2010 Community & Environment Road Maintenance £6,489.44
September 16 2010 Central Balances Projs Non Lab Clearing Ac £6,376.17
September 16 2010 Central Balances Projs Non Lab Clearing Ac £6,215.93
September 16 2010 Central Balances Projs Non Lab Clearing Ac £6,207.72
September 16 2010 Community & Environment Road Maintenance £6,107.14
September 16 2010 Community & Environment Road Maintenance £5,960.65
September 16 2010 Central Balances Projs Non Lab Clearing Ac £5,773.87
September 16 2010 Community & Environment Road Maintenance £5,638.45
September 16 2010 Community & Environment Road Maintenance £5,302.89
September 16 2010 Community & Environment Road Maintenance £4,926.88
September 16 2010 Community & Environment Road Maintenance £4,741.49
September 16 2010 Community & Environment Road Maintenance £4,667.09
September 16 2010 Community & Environment Road Maintenance £4,655.10
September 16 2010 Community & Environment Road Maintenance £4,508.09
September 16 2010 Community & Environment Road Maintenance £4,495.02
September 16 2010 Community & Environment Road Maintenance £4,463.28
September 16 2010 Community & Environment Road Maintenance £4,447.40
September 16 2010 Community & Environment Road Maintenance £4,342.42
September 16 2010 Community & Environment Road Maintenance £4,302.18
September 16 2010 Community & Environment Road Maintenance £4,098.84
September 16 2010 Community & Environment Road Maintenance £4,068.39
September 16 2010 Community & Environment Rech for Overheads £3,959.66
September 16 2010 Community & Environment Road Maintenance £3,851.73
September 16 2010 Community & Environment Road Maintenance £3,772.04
September 16 2010 Community & Environment Road Maintenance £3,769.95
September 16 2010 Community & Environment Road Maintenance £3,662.35
September 16 2010 Community & Environment Road Maintenance £3,661.46
September 16 2010 Community & Environment Road Maintenance £3,592.76
September 16 2010 Central Balances Projs Non Lab Clearing Ac £3,535.23
September 16 2010 Community & Environment Road Maintenance £3,502.26
September 16 2010 Community & Environment Road Maintenance £3,446.37
September 16 2010 Community & Environment Rech for Overheads £3,415.66
September 16 2010 Community & Environment Road Maintenance £3,399.43
September 16 2010 Community & Environment Road Maintenance £3,392.11
September 16 2010 Community & Environment Road Maintenance £3,350.68
September 16 2010 Community & Environment Road Maintenance £3,311.31
September 16 2010 Community & Environment Road Maintenance £3,281.77
September 16 2010 Central Balances Projs Non Lab Clearing Ac £3,268.59
September 16 2010 Community & Environment Road Maintenance £3,226.61
September 16 2010 Community & Environment Road Maintenance £3,216.24
September 16 2010 Community & Environment Road Maintenance £3,142.12
September 16 2010 Community & Environment Road Maintenance £3,129.14
September 16 2010 Community & Environment Road Maintenance £3,098.08
September 16 2010 Community & Environment Road Maintenance £3,089.85
September 16 2010 Community & Environment Road Maintenance £3,006.39
September 16 2010 Community & Environment Road Maintenance £2,951.07
September 16 2010 Community & Environment Road Maintenance £2,948.08
September 16 2010 Community & Environment Road Maintenance £2,901.06
September 16 2010 Community & Environment Road Maintenance £2,875.03
September 16 2010 Community & Environment Road Maintenance £2,864.13
September 16 2010 Community & Environment Road Maintenance £2,795.69
September 16 2010 Community & Environment Road Maintenance £2,750.24
September 16 2010 Central Balances Construction £2,739.80
September 16 2010 Central Balances Projs Non Lab Clearing Ac £2,723.98
September 16 2010 Community & Environment Road Maintenance £2,706.86
September 16 2010 Community & Environment Road Maintenance £2,704.13
September 16 2010 Community & Environment Road Maintenance £2,627.03
September 16 2010 Community & Environment Road Maintenance £2,597.74
September 16 2010 Community & Environment Road Maintenance £2,574.29
September 16 2010 Community & Environment Road Maintenance £2,563.15
September 16 2010 Community & Environment Road Maintenance £2,520.28
September 16 2010 Community & Environment Road Maintenance £2,482.38
September 16 2010 Community & Environment Road Maintenance £2,478.38
September 16 2010 Community & Environment Road Maintenance £2,474.38
September 16 2010 Community & Environment Road Maintenance £2,457.22
September 16 2010 Community & Environment Road Maintenance £2,449.39
September 16 2010 Community & Environment Road Maintenance £2,387.16
September 16 2010 Community & Environment Road Maintenance £2,353.87
September 16 2010 Community & Environment Road Maintenance £2,336.58
September 16 2010 Community & Environment Road Maintenance £2,320.42
September 16 2010 Community & Environment Road Maintenance £2,293.70
September 16 2010 Community & Environment Road Maintenance £2,290.18
September 16 2010 Community & Environment Road Maintenance £2,277.94
September 16 2010 Community & Environment Road Maintenance £2,261.42
September 16 2010 Central Balances Projs Non Lab Clearing Ac £2,220.33
September 16 2010 Central Balances Projs Non Lab Clearing Ac £2,212.80
September 16 2010 Community & Environment Road Maintenance £2,207.39
September 16 2010 Community & Environment Road Maintenance £2,108.75

Last updated 09 Nov 13:07 (over 2 years ago)