DateDepartmentCategoryValue
March 1 2010 RESPONSIVE & PLANNED MAINTENAN not provided £24,624.00
May 14 2009 RESPONSIVE & PLANNED MAINTENAN not provided £22,648.16
July 23 2009 RESPONSIVE & PLANNED MAINTENAN not provided £21,879.91
August 21 2009 RESPONSIVE & PLANNED MAINTENAN not provided £19,054.47
November 5 2009 FLATS COMMUNAL SERVICES not provided £17,878.75
April 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £14,904.33
July 9 2009 RESPONSIVE & PLANNED MAINTENAN not provided £12,665.42
May 14 2009 RESPONSIVE & PLANNED MAINTENAN not provided £10,167.32
September 17 2009 RESPONSIVE & PLANNED MAINTENAN not provided £9,414.61
May 14 2009 RESPONSIVE & PLANNED MAINTENAN not provided £9,208.38
February 9 2010 RESPONSIVE & PLANNED MAINTENAN not provided £8,298.36
May 22 2009 RESPONSIVE & PLANNED MAINTENAN not provided £7,646.55
October 7 2009 FLATS COMMUNAL SERVICES not provided £7,398.46
June 26 2009 RESPONSIVE & PLANNED MAINTENAN not provided £7,180.80
May 14 2009 RESPONSIVE & PLANNED MAINTENAN not provided £7,049.52
April 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £6,867.73
February 3 2010 RESPONSIVE & PLANNED MAINTENAN not provided £6,844.52
December 9 2009 FLATS COMMUNAL SERVICES not provided £6,838.91
May 22 2009 RESPONSIVE & PLANNED MAINTENAN not provided £6,651.21
December 21 2009 RESPONSIVE & PLANNED MAINTENAN not provided £6,451.80
May 14 2009 RESPONSIVE & PLANNED MAINTENAN not provided £6,241.65
July 9 2009 RESPONSIVE & PLANNED MAINTENAN not provided £6,110.03
February 19 2010 RESPONSIVE & PLANNED MAINTENAN not provided £5,649.72
April 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £5,591.40
December 4 2009 FLATS COMMUNAL SERVICES not provided £5,476.71
May 22 2009 RESPONSIVE & PLANNED MAINTENAN not provided £5,380.38
March 10 2010 RESPONSIVE & PLANNED MAINTENAN not provided £5,336.40
May 22 2009 RESPONSIVE & PLANNED MAINTENAN not provided £4,915.77
May 14 2009 RESPONSIVE & PLANNED MAINTENAN not provided £4,854.28
May 19 2009 RESPONSIVE & PLANNED MAINTENAN not provided £4,712.81
August 21 2009 RESPONSIVE & PLANNED MAINTENAN not provided £4,566.42
April 22 2009 RESPONSIVE & PLANNED MAINTENAN not provided £4,386.71
May 11 2009 RESPONSIVE & PLANNED MAINTENAN not provided £4,340.35
July 9 2009 RESPONSIVE & PLANNED MAINTENAN not provided £4,171.21
June 23 2009 RESPONSIVE & PLANNED MAINTENAN not provided £4,049.41
June 11 2009 RESPONSIVE & PLANNED MAINTENAN not provided £3,900.60
April 22 2009 RESPONSIVE & PLANNED MAINTENAN not provided £3,813.04
April 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £3,719.09
December 4 2009 RESPONSIVE & PLANNED MAINTENAN not provided £3,705.64
June 8 2009 FLATS COMMUNAL SERVICES not provided £3,553.88
May 14 2009 RESPONSIVE & PLANNED MAINTENAN not provided £3,515.90
March 1 2010 RESPONSIVE & PLANNED MAINTENAN not provided £3,297.98
June 26 2009 RESPONSIVE & PLANNED MAINTENAN not provided £3,291.04
July 9 2009 RESPONSIVE & PLANNED MAINTENAN not provided £3,154.94
December 21 2009 FLATS COMMUNAL SERVICES not provided £3,103.61
May 22 2009 FLATS COMMUNAL SERVICES not provided £3,062.82
October 15 2009 RESPONSIVE & PLANNED MAINTENAN not provided £3,008.96
May 22 2009 RESPONSIVE & PLANNED MAINTENAN not provided £2,925.46
July 9 2009 FLATS COMMUNAL SERVICES not provided £2,904.32
June 11 2009 RESPONSIVE & PLANNED MAINTENAN not provided £2,900.96
May 14 2009 RESPONSIVE & PLANNED MAINTENAN not provided £2,815.05
August 21 2009 FLATS COMMUNAL SERVICES not provided £2,789.84
September 17 2009 FLATS COMMUNAL SERVICES not provided £2,789.38
January 22 2010 RESPONSIVE & PLANNED MAINTENAN not provided £2,734.08
May 14 2009 RESPONSIVE & PLANNED MAINTENAN not provided £2,683.38
November 6 2009 RESPONSIVE & PLANNED MAINTENAN not provided £2,645.97
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £2,549.75
June 23 2009 RESPONSIVE & PLANNED MAINTENAN not provided £2,527.80
December 21 2009 RENOVATIONS not provided £2,477.76
February 19 2010 RESPONSIVE & PLANNED MAINTENAN not provided £2,448.75
May 14 2009 FLATS COMMUNAL SERVICES not provided £2,435.82
April 14 2009 RESPONSIVE & PLANNED MAINTENAN not provided £2,426.91
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £2,424.36
November 5 2009 RESPONSIVE & PLANNED MAINTENAN not provided £2,331.00
July 9 2009 RESPONSIVE & PLANNED MAINTENAN not provided £2,306.88
February 9 2010 RESPONSIVE & PLANNED MAINTENAN not provided £2,266.57
September 25 2009 RESPONSIVE & PLANNED MAINTENAN not provided £2,245.79
March 10 2010 RESPONSIVE & PLANNED MAINTENAN not provided £2,198.96
January 22 2010 FLATS COMMUNAL SERVICES not provided £2,166.81
June 11 2009 RESPONSIVE & PLANNED MAINTENAN not provided £2,141.75
July 3 2009 RESPONSIVE & PLANNED MAINTENAN not provided £2,073.44
May 22 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,993.86
November 20 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,958.28
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,685.30
August 21 2009 FLATS COMMUNAL SERVICES not provided £1,655.63
May 14 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,648.95
October 15 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,610.86
July 21 2009 FLATS COMMUNAL SERVICES not provided £1,600.00
January 22 2010 FLATS COMMUNAL SERVICES not provided £1,593.46
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,561.42
September 3 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,517.77
August 21 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,490.93
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,474.34
December 4 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,462.02
November 6 2009 FLATS COMMUNAL SERVICES not provided £1,457.98
May 19 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,449.24
February 12 2010 FLATS COMMUNAL SERVICES not provided £1,438.60
November 5 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,414.31
June 15 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,401.22
April 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,392.76
November 3 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,334.25
May 22 2009 FLATS COMMUNAL SERVICES not provided £1,331.31
September 3 2009 FLATS COMMUNAL SERVICES not provided £1,281.21
April 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,246.26
March 1 2010 RESPONSIVE & PLANNED MAINTENAN not provided £1,207.90
November 5 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,200.00
February 9 2010 FLATS COMMUNAL SERVICES not provided £1,188.00
February 9 2010 FLATS COMMUNAL SERVICES not provided £1,188.00
May 14 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,174.41
July 9 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,163.28
May 11 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,151.00
November 3 2009 FLATS COMMUNAL SERVICES not provided £1,150.00
August 20 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,124.27
May 11 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,114.00
May 11 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,114.00
May 22 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,112.80
August 6 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,099.79
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,095.08
November 6 2009 FLATS COMMUNAL SERVICES not provided £1,093.52
November 6 2009 FLATS COMMUNAL SERVICES not provided £1,093.50
February 19 2010 RESPONSIVE & PLANNED MAINTENAN not provided £1,065.68
October 15 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,032.58
June 15 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,025.28
April 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,009.42
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,008.00
October 15 2009 RESPONSIVE & PLANNED MAINTENAN not provided £1,006.42
January 14 2010 RESPONSIVE & PLANNED MAINTENAN not provided £1,001.72
November 20 2009 RESPONSIVE & PLANNED MAINTENAN not provided £987.49
February 19 2010 RESPONSIVE & PLANNED MAINTENAN not provided £984.55
May 11 2009 RESPONSIVE & PLANNED MAINTENAN not provided £980.00
May 11 2009 RESPONSIVE & PLANNED MAINTENAN not provided £980.00
October 15 2009 RESPONSIVE & PLANNED MAINTENAN not provided £960.31
June 15 2009 RESPONSIVE & PLANNED MAINTENAN not provided £956.93
May 19 2009 RESPONSIVE & PLANNED MAINTENAN not provided £934.47
May 14 2009 FLATS COMMUNAL SERVICES not provided £932.02
June 15 2009 RESPONSIVE & PLANNED MAINTENAN not provided £922.75
December 4 2009 FLATS COMMUNAL SERVICES not provided £891.00
December 4 2009 RESPONSIVE & PLANNED MAINTENAN not provided £874.27
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £863.00
February 12 2010 FLATS COMMUNAL SERVICES not provided £847.76
February 12 2010 FLATS COMMUNAL SERVICES not provided £847.46
July 24 2009 FLATS COMMUNAL SERVICES not provided £845.22
April 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £841.80
May 14 2009 RESPONSIVE & PLANNED MAINTENAN not provided £841.77
April 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £804.64
May 19 2009 RESPONSIVE & PLANNED MAINTENAN not provided £800.00
July 9 2009 RESPONSIVE & PLANNED MAINTENAN not provided £776.69
May 22 2009 RESPONSIVE & PLANNED MAINTENAN not provided £770.32
December 4 2009 RESPONSIVE & PLANNED MAINTENAN not provided £749.29
March 2 2010 RESPONSIVE & PLANNED MAINTENAN not provided £747.60
August 21 2009 FLATS COMMUNAL SERVICES not provided £729.02
September 3 2009 RESPONSIVE & PLANNED MAINTENAN not provided £725.14
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £717.70
May 14 2009 FLATS COMMUNAL SERVICES not provided £714.42
May 14 2009 FLATS COMMUNAL SERVICES not provided £714.42
July 9 2009 RESPONSIVE & PLANNED MAINTENAN not provided £690.00
December 21 2009 RESPONSIVE & PLANNED MAINTENAN not provided £683.52
February 12 2010 FLATS COMMUNAL SERVICES not provided £671.24
July 23 2009 FLATS COMMUNAL SERVICES not provided £645.71
July 23 2009 FLATS COMMUNAL SERVICES not provided £645.71
July 23 2009 FLATS COMMUNAL SERVICES not provided £645.71
July 23 2009 FLATS COMMUNAL SERVICES not provided £645.71
October 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £642.09
December 21 2009 RESPONSIVE & PLANNED MAINTENAN not provided £640.80
December 21 2009 RESPONSIVE & PLANNED MAINTENAN not provided £640.80
September 3 2009 FLATS COMMUNAL SERVICES not provided £637.89
December 21 2009 RESPONSIVE & PLANNED MAINTENAN not provided £636.48
November 5 2009 RESPONSIVE & PLANNED MAINTENAN not provided £631.19
April 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £630.99
May 22 2009 FLATS COMMUNAL SERVICES not provided £602.87
May 19 2009 FLATS COMMUNAL SERVICES not provided £600.00
July 3 2009 FLATS COMMUNAL SERVICES not provided £598.08
December 21 2009 RESPONSIVE & PLANNED MAINTENAN not provided £598.08
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £596.50
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £588.92
November 20 2009 RESPONSIVE & PLANNED MAINTENAN not provided £582.30
July 23 2009 FLATS COMMUNAL SERVICES not provided £581.63
April 22 2009 RESPONSIVE & PLANNED MAINTENAN not provided £574.58
June 8 2009 FLATS COMMUNAL SERVICES not provided £573.10
June 8 2009 FLATS COMMUNAL SERVICES not provided £570.96
June 26 2009 RESPONSIVE & PLANNED MAINTENAN not provided £570.37
February 19 2010 RESPONSIVE & PLANNED MAINTENAN not provided £540.00
May 14 2009 FLATS COMMUNAL SERVICES not provided £532.89
May 14 2009 FLATS COMMUNAL SERVICES not provided £532.89
May 14 2009 FLATS COMMUNAL SERVICES not provided £532.89
May 14 2009 FLATS COMMUNAL SERVICES not provided £532.89
May 14 2009 FLATS COMMUNAL SERVICES not provided £532.89
May 14 2009 FLATS COMMUNAL SERVICES not provided £532.89
June 23 2009 RESPONSIVE & PLANNED MAINTENAN not provided £527.04
December 21 2009 RESPONSIVE & PLANNED MAINTENAN not provided £512.64
December 18 2009 RESPONSIVE & PLANNED MAINTENAN not provided £501.31
May 11 2009 FLATS COMMUNAL SERVICES not provided £500.88
December 21 2009 RESPONSIVE & PLANNED MAINTENAN not provided £491.28
July 9 2009 RESPONSIVE & PLANNED MAINTENAN not provided £481.79
June 8 2009 RESPONSIVE & PLANNED MAINTENAN not provided £476.38
December 4 2009 FLATS COMMUNAL SERVICES not provided £476.06
September 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £472.70
December 21 2009 RESPONSIVE & PLANNED MAINTENAN not provided £469.92
April 7 2009 FLATS COMMUNAL SERVICES not provided £451.64
December 4 2009 FLATS COMMUNAL SERVICES not provided £451.43
April 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £450.00
December 21 2009 RESPONSIVE & PLANNED MAINTENAN not provided £448.56
July 9 2009 RESPONSIVE & PLANNED MAINTENAN not provided £448.35
May 11 2009 RESPONSIVE & PLANNED MAINTENAN not provided £445.28
December 4 2009 FLATS COMMUNAL SERVICES not provided £442.19
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £437.07
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £435.02
November 5 2009 RESPONSIVE & PLANNED MAINTENAN not provided £422.78
September 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £419.42
July 24 2009 FLATS COMMUNAL SERVICES not provided £416.52
July 24 2009 FLATS COMMUNAL SERVICES not provided £416.52
July 24 2009 FLATS COMMUNAL SERVICES not provided £415.45
July 24 2009 FLATS COMMUNAL SERVICES not provided £414.50
November 5 2009 RESPONSIVE & PLANNED MAINTENAN not provided £414.39
April 7 2009 FLATS COMMUNAL SERVICES not provided £410.60
June 23 2009 FLATS COMMUNAL SERVICES not provided £405.84
April 22 2009 FLATS COMMUNAL SERVICES not provided £400.00
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £397.30
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £396.00
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £388.83
April 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £388.75
May 14 2009 FLATS COMMUNAL SERVICES not provided £383.21
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £371.76
November 5 2009 RESPONSIVE & PLANNED MAINTENAN not provided £367.44
June 26 2009 FLATS COMMUNAL SERVICES not provided £365.56
June 26 2009 FLATS COMMUNAL SERVICES not provided £365.56
June 26 2009 FLATS COMMUNAL SERVICES not provided £365.56
October 7 2009 FLATS COMMUNAL SERVICES not provided £360.00
October 7 2009 FLATS COMMUNAL SERVICES not provided £360.00
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £357.78
June 26 2009 FLATS COMMUNAL SERVICES not provided £355.02
July 24 2009 FLATS COMMUNAL SERVICES not provided £354.58
September 3 2009 RESPONSIVE & PLANNED MAINTENAN not provided £353.94
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £351.51
February 19 2010 FLATS COMMUNAL SERVICES not provided £351.20
September 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £350.00
December 16 2009 FLATS COMMUNAL SERVICES not provided £348.84
July 24 2009 FLATS COMMUNAL SERVICES not provided £347.81
July 24 2009 FLATS COMMUNAL SERVICES not provided £347.10
September 7 2009 FLATS COMMUNAL SERVICES not provided £345.45
December 21 2009 RESPONSIVE & PLANNED MAINTENAN not provided £341.76
November 5 2009 RESPONSIVE & PLANNED MAINTENAN not provided £335.06
May 19 2009 FLATS COMMUNAL SERVICES not provided £332.73
May 19 2009 FLATS COMMUNAL SERVICES not provided £332.73
May 19 2009 FLATS COMMUNAL SERVICES not provided £332.73
December 16 2009 FLATS COMMUNAL SERVICES not provided £328.32
October 15 2009 FLATS COMMUNAL SERVICES not provided £319.56
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £317.20
December 16 2009 FLATS COMMUNAL SERVICES not provided £314.00
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £310.80
May 22 2009 FLATS COMMUNAL SERVICES not provided £310.68
January 22 2010 RESPONSIVE & PLANNED MAINTENAN not provided £301.10
July 24 2009 FLATS COMMUNAL SERVICES not provided £299.04
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £291.56
November 5 2009 FLATS COMMUNAL SERVICES not provided £288.00
December 21 2009 RESPONSIVE & PLANNED MAINTENAN not provided £277.68
November 5 2009 RESPONSIVE & PLANNED MAINTENAN not provided £277.47
June 11 2009 FLATS COMMUNAL SERVICES not provided £275.54
December 4 2009 FLATS COMMUNAL SERVICES not provided £272.14
November 5 2009 FLATS COMMUNAL SERVICES not provided £271.28
July 21 2009 RESPONSIVE & PLANNED MAINTENAN not provided £270.04
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £261.66
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £261.46
November 5 2009 FLATS COMMUNAL SERVICES not provided £257.58
September 25 2009 RENOVATIONS not provided £256.32
December 4 2009 FLATS COMMUNAL SERVICES not provided £254.18
July 24 2009 FLATS COMMUNAL SERVICES not provided £252.05
February 19 2010 FLATS COMMUNAL SERVICES not provided £250.00
October 7 2009 FLATS COMMUNAL SERVICES not provided £245.64
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £238.84
December 4 2009 RESPONSIVE & PLANNED MAINTENAN not provided £229.84
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £226.42
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £225.64
September 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £217.88
January 22 2010 FLATS COMMUNAL SERVICES not provided £210.81
September 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £200.00
July 24 2009 FLATS COMMUNAL SERVICES not provided £197.58
November 5 2009 FLATS COMMUNAL SERVICES not provided £191.17
September 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £186.70
November 5 2009 FLATS COMMUNAL SERVICES not provided £181.56
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £180.34
January 14 2010 RESPONSIVE & PLANNED MAINTENAN not provided £178.84
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £174.08
December 4 2009 FLATS COMMUNAL SERVICES not provided £172.37
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £160.20
December 16 2009 FLATS COMMUNAL SERVICES not provided £153.90
November 5 2009 FLATS COMMUNAL SERVICES not provided £153.16
December 16 2009 FLATS COMMUNAL SERVICES not provided £152.73
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £151.66
July 3 2009 HOUSING OUTSIDE THE HRA not provided £150.00
March 1 2010 RESPONSIVE & PLANNED MAINTENAN not provided £150.00
February 19 2010 RESPONSIVE & PLANNED MAINTENAN not provided £150.00
December 4 2009 RESPONSIVE & PLANNED MAINTENAN not provided £150.00
July 9 2009 FLATS COMMUNAL SERVICES not provided £146.72
November 5 2009 RESPONSIVE & PLANNED MAINTENAN not provided £144.18
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £144.18
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £140.58
December 4 2009 FLATS COMMUNAL SERVICES not provided £140.56
November 5 2009 RESPONSIVE & PLANNED MAINTENAN not provided £137.35
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £133.50
December 16 2009 FLATS COMMUNAL SERVICES not provided £132.36
December 16 2009 FLATS COMMUNAL SERVICES not provided £130.29
February 19 2010 RESPONSIVE & PLANNED MAINTENAN not provided £128.84
December 21 2009 RESPONSIVE & PLANNED MAINTENAN not provided £128.16
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £122.72
July 24 2009 FLATS COMMUNAL SERVICES not provided £121.75
November 5 2009 RESPONSIVE & PLANNED MAINTENAN not provided £117.48
September 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £115.34
November 5 2009 FLATS COMMUNAL SERVICES not provided £111.17
January 22 2010 FLATS COMMUNAL SERVICES not provided £110.81
December 16 2009 FLATS COMMUNAL SERVICES not provided £107.11
September 3 2009 RESPONSIVE & PLANNED MAINTENAN not provided £106.80
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £101.47
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £101.46
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £100.55
March 1 2010 RESPONSIVE & PLANNED MAINTENAN not provided £100.00
November 3 2009 RESPONSIVE & PLANNED MAINTENAN not provided £100.00
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £98.68
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £97.47
June 23 2009 FLATS COMMUNAL SERVICES not provided £96.12
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £96.12
September 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £93.98
June 11 2009 FLATS COMMUNAL SERVICES not provided £92.92
November 5 2009 RESPONSIVE & PLANNED MAINTENAN not provided £92.72
September 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £92.72
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £90.78
December 16 2009 FLATS COMMUNAL SERVICES not provided £86.83
October 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £86.51
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £86.51
December 16 2009 FLATS COMMUNAL SERVICES not provided £85.44
September 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £81.17
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £81.17
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £81.05
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £81.05
February 19 2010 FLATS COMMUNAL SERVICES not provided £80.00
February 19 2010 HEATING not provided £80.00
December 4 2009 FLATS COMMUNAL SERVICES not provided £80.00
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £77.97
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £77.97
September 7 2009 FLATS COMMUNAL SERVICES not provided £76.90
December 4 2009 ENVIRONMENTAL WORKS not provided £75.00
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £75.00
September 7 2009 FLATS COMMUNAL SERVICES not provided £70.49
July 24 2009 FLATS COMMUNAL SERVICES not provided £69.42
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £68.74
January 14 2010 RESPONSIVE & PLANNED MAINTENAN not provided £68.35
June 11 2009 RESPONSIVE & PLANNED MAINTENAN not provided £68.06
November 5 2009 RESPONSIVE & PLANNED MAINTENAN not provided £67.72
September 3 2009 RESPONSIVE & PLANNED MAINTENAN not provided £64.08
January 14 2010 RESPONSIVE & PLANNED MAINTENAN not provided £64.08
July 3 2009 FLATS COMMUNAL SERVICES not provided £61.94
January 14 2010 FLATS COMMUNAL SERVICES not provided £60.88
September 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £60.68
November 5 2009 RESPONSIVE & PLANNED MAINTENAN not provided £59.81
September 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £59.81
September 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £58.74
July 3 2009 FLATS COMMUNAL SERVICES not provided £57.67
September 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £57.67
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £57.67
January 14 2010 RESPONSIVE & PLANNED MAINTENAN not provided £57.67
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £55.54
July 24 2009 FLATS COMMUNAL SERVICES not provided £53.40
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £50.89
November 5 2009 RESPONSIVE & PLANNED MAINTENAN not provided £50.00
September 7 2009 FLATS COMMUNAL SERVICES not provided £50.00
September 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £50.00
April 22 2009 RESPONSIVE & PLANNED MAINTENAN not provided £49.99
November 5 2009 RESPONSIVE & PLANNED MAINTENAN not provided £48.06
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £48.06
February 19 2010 RESPONSIVE & PLANNED MAINTENAN not provided £48.06
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £47.00
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £44.86
September 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £44.23
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £43.09
June 23 2009 FLATS COMMUNAL SERVICES not provided £42.72
November 5 2009 FLATS COMMUNAL SERVICES not provided £42.72
September 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £41.87
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £41.66
July 24 2009 FLATS COMMUNAL SERVICES not provided £41.66
October 7 2009 FLATS COMMUNAL SERVICES not provided £40.00
November 3 2009 RESPONSIVE & PLANNED MAINTENAN not provided £40.00
June 26 2009 RESPONSIVE & PLANNED MAINTENAN not provided £40.00
January 14 2010 FLATS COMMUNAL SERVICES not provided £39.52
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £34.89
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £34.18
October 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £34.18
January 14 2010 RESPONSIVE & PLANNED MAINTENAN not provided £32.04
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £32.04
January 14 2010 RESPONSIVE & PLANNED MAINTENAN not provided £32.04
November 5 2009 RESPONSIVE & PLANNED MAINTENAN not provided £32.04
April 22 2009 FLATS COMMUNAL SERVICES not provided £30.98
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £30.78
January 14 2010 RESPONSIVE & PLANNED MAINTENAN not provided £30.00
July 9 2009 FLATS COMMUNAL SERVICES not provided £29.54
January 14 2010 RESPONSIVE & PLANNED MAINTENAN not provided £28.84
November 5 2009 RESPONSIVE & PLANNED MAINTENAN not provided £28.84
September 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £28.84
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £28.84
July 24 2009 FLATS COMMUNAL SERVICES not provided £28.84
January 14 2010 RESPONSIVE & PLANNED MAINTENAN not provided £28.84
January 14 2010 RESPONSIVE & PLANNED MAINTENAN not provided £28.84
January 14 2010 RESPONSIVE & PLANNED MAINTENAN not provided £28.84
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £28.84
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £28.73
July 9 2009 FLATS COMMUNAL SERVICES not provided £27.70
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £27.70
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £26.68
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £25.63
February 19 2010 ENVIRONMENTAL WORKS not provided £25.00
June 23 2009 FLATS COMMUNAL SERVICES not provided £24.62
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £21.36
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £21.36
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £20.52
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £20.52
December 4 2009 FLATS COMMUNAL SERVICES not provided £20.52
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £20.52
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £20.52
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £19.90
September 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £19.22
June 23 2009 FLATS COMMUNAL SERVICES not provided £18.47
November 5 2009 RESPONSIVE & PLANNED MAINTENAN not provided £18.16
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £18.16
July 24 2009 FLATS COMMUNAL SERVICES not provided £16.02
July 24 2009 FLATS COMMUNAL SERVICES not provided £16.02
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £14.95
January 14 2010 FLATS COMMUNAL SERVICES not provided £12.82
September 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £12.82
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £10.68
July 24 2009 FLATS COMMUNAL SERVICES not provided £10.68
September 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £10.68
November 5 2009 RESPONSIVE & PLANNED MAINTENAN not provided £10.68
January 14 2010 RESPONSIVE & PLANNED MAINTENAN not provided £10.68
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £10.26
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £10.26
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £7.48
December 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £7.18
September 7 2009 RESPONSIVE & PLANNED MAINTENAN not provided £6.41
January 14 2010 RESPONSIVE & PLANNED MAINTENAN not provided £6.41
January 14 2010 RESPONSIVE & PLANNED MAINTENAN not provided £6.41
January 14 2010 RESPONSIVE & PLANNED MAINTENAN not provided £6.41
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £6.41
December 16 2009 FLATS COMMUNAL SERVICES not provided £5.77
April 16 2009 RESPONSIVE & PLANNED MAINTENAN not provided £-533.00
October 23 2009 FLATS COMMUNAL SERVICES not provided £-738.72
May 28 2009 RESPONSIVE & PLANNED MAINTENAN not provided £-767.73
July 24 2009 RESPONSIVE & PLANNED MAINTENAN not provided £-3,987.07

Last updated 23 Aug 20:49 (over 3 years ago)

API Get this info as xml or json help